Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

Map 10: Equity Analysis Composite EQUITY ANALYSIS

Plan Review TOWN OF FUQUAY-VARINA COMMUNITY PEDESTRIAN MASTER PLAN (2013) This is Fuquay-Varina’s existing pedestrian plan document, created in 2013. The 2013 recommendations included infrastructure, programming, and policy recommendations. Map 3.6 from the 2013 plan (see below) highlights gap areas in the pedestrian network, many of which have been completed or partially completed since 2013 (see page 19 & 17 for projects completed since 2013). Policy recommendations from the 2013 plan included a detailed analysis of Fuquay-Varina’s Code of Ordinances, most of which have been incorporated into the current Code of Ordinances.

Ä 55

APEX

HOLLY SPRINGS

CARY

GARNER

WHATAN

O

THR

N DR

STO N

Map 3.5: Pedestrian Network Infill Areas

Fuquay-Varina High School Map 3.6: Pedestrian Network Infill Areas in Downtown Cores O

Map from the 2013 Pedestrian Plan

¬« 55

Wake Chapel Church

PERR

DICKENS RD

£ 401

OLD POWELL RD

CR

N MAIN ST

£¤ 401

Action Park

X

CHERRY ST

Lincoln Heights Elementary School

FAUCETTE ST

D B

Lawrence Street Park and School

E

OLD

Ä 55

CHURCH ST

AIKEN PKWY

Ä 42

ONEARCHDR

Fuquay-Varina Middle School

JUDD

¬« 55

A

£¤ 401

WS

JONES AVE

Falcon Park

E ACADEMY

¬« 42

FIRST ST

Library Park

DEPOT ST

Town Dog Park

O

W VANCE ST

¬« 55 ¬« 55

£¤ 401 £¤ 401

£ 401

Honey Road

E SPRING ST

Fuquay Mineral Spring Park

Fleming Loop Road Park

H

W S

S

SUNSET DR

FEATURES AND BOUNDARIES SOCIAL VULNERABILITY

AY

Intersection or Crossing Gaps Trail Gaps Sidewalk Gaps Intersection or Crossing Gaps Trail Gaps Sidewalk Gaps

r

Kinton Field

T

ANGIER

r

0

0.5

1MILES

LOW

PINE ST

EQUITY ANALYSIS This map is a composite of six variables, including; Zero vehicle households, Educational attainment, Race, Income Level, Language, and Age. Areas shaded in the darkest red (high social vulnerability) have the highest concentrations of these demographic variables. Downtown Fuquay, the southwest section of Fuquay-Varina, and a section in northeast Fuquay-Varina are found in the high social vulnerability category. These are important locations to consider during project prioritization, and the project team utilized this map during the prioritization process to identify whether a potential project connected to these particular areas of Fuquay-Varina. While other prioritization factors are also considered during project selection, each of the priority projects identified in Chapter 3 are wholly within, or provide a connection to a location identified as ‘High’ in the social vulnerability index in Fuquay-Varina.

CRE

QUEST RIDGE

Existing Sidewalks

Parks

DON ST Existing/Under Const. Trails Committed Sidewalk/Trail Development

! IntersectionImprovements â â â â â Proposed Greenway Trail ! IntersectionImprovements â â â â â Proposed Greenway Trail Railroad Water Features Flood Hazard Area Fuquay-Varina Municipal Boundary ETJ Boundary Proposed Side Path Proposed Sidewalk Proposed Side Path Proposed Sidewalk

OO

HIGH

S JUDD PKW

Downtown Cores Schools

South Park

FEATURES AND BOUNDARIES STREAM/RIVER

¯

OODDR

¯

HENW

RAILROAD

0.25 Downtown Cores Parks Schools Existing Sidewalks Existing Trails 1 Parks Schools Existing Sidewalks Existing Trails Downtown Cores 1

0.5 Railroad Water Features Fuquay-Varina Municipal Boundary ETJ Boundary Railroad Water Features Fuquay-Varina Municipal Boundary ETJ Boundary Mi 2 Mi

0

RD

0

COUNTY BOUNDARY

3-9 FUQUAY-VARINA, NC COMMUNITY PEDESTRIAN MASTER PLAN – CHAPTER 3: NETWORK RECOMMENDATIONS

¯ ¯

0

2

Mi

0

1

2

Mi

30

31

CHAPTER 2: EXISTING CONDITIONS

FUQUAY-VARINA PEDESTRIAN PLAN

Made with FlippingBook - PDF hosting