Wake Forest Renaissance Plan - September 2017

97

C h a p t e r 6 C onnect t he C or e

Legend

Taylor StreetPark

parks existing greenways planned greenways renaissance area

Create better pedestrian connectivity from Owen Ave past Town Hall to the public parking on Taylor Street and beyond to H.L. Miller Park and the greenway network.

Southeastern Baptist Theological Seminary

HoldingPark

Wake Forest Elementary School

Town Hall

H.L.MillerPark

Proposed connection from planned greenway to Franklin Street gives better access to residents on the east side of the greenway.

KiwanisPark

ALT 1

98

RECOMMENDATION 6C: Build the Downtown Connector greenway and add a connection from Deacon Ridge Street to Franklin Street at mid-block.

DunnCreek

S S Figure 6.3.1: Wake Forest existing and planned greenways

Made with FlippingBook - professional solution for displaying marketing and sales documents online