Pneumatic Trailers - Owners Manual

Loading And Unloading The Trailer

NOTICE

Risk of contaminated material. Check contents of unloading site before discharging load contents into it.

NOTICE

Risk of damage to equipment. Verify unloading site has the capacity and structural integrity required before discharging load contents into it. 3. Remove discharge hose from storage tube and connect hose to discharge line and to unloading site. 4. Verify storage facility has adequate capacity for load. 5. If equipped, verify filter actuator is closed. 6. Connect air supply to air inlet coupler (B). See Figure 5-7

Figure 5-7 – Air Inlet Coupler

7. Open proportioning valve 8. Engage blower. 9. Open main aeration valve (C) and close blow down valve (D). See Figure 5-8.

Figure 5-8 – Main Aeration Valve Open

26

Made with FlippingBook Annual report maker