2026-2028 Grower Success Guide

PERENNIALS | VEGETATIVE PROPAGATION

Achillea millefolium Yarrow DESERT EVE ™

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

5–6 weeks

70–72 °F (21–22 °C) for the first three weeks.

Begin fertilization at 75 ppm N when roots become visible. Rates can be increased up to 100 ppm N after roots become well developed.

First Year Flowering

Arenaria montana Sandwort SUMMER / WINTER

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

5–6 weeks

68–70 °F (20–21 °C) for the first three weeks. After roots are well developed, temperatures can be lowered to 64–68 °F (18–20 °C) to hold and tone the cuttings.

Begin fertilization at 80 ppm N when roots become visible. Rates can be increased up to 150 ppm N after roots become well developed.

Pinching is recommended in prop 7–10 days prior to transplant leaving 4–6 nodes.

First Year Flowering

Aubrieta hybrida Aubrieta AXCENT ™ / GLACIER ™

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

5–6 weeks

70–72 °F (21–22 °C) for the first three weeks.

Begin fertilization at 50 ppm N when roots become visible. Rates can be increased up to 75 ppm N after roots become well developed.

Cold Required

The use of tents during propagation to avoid over misting has also been found to be beneficial. If needed, a spray of B-Nine ® WSG at 500–1,500 ppm can be applied.

Campanula interspecific Bellflower CARIBOO ™

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

5–6 weeks

68–70 °F (20–21 °C) for the first three weeks. After roots are well developed, temperatures can be lowered to 64–68 °F (18–20 °C) to hold and tone the cuttings.

Begin fertilization at 80 ppm N when roots become visible. Rates can be increased up to 150 ppm N after roots become well developed.

Lighting should be under short days to promote vegetative growth.

First Year Flowering

Coreopsis grandiflora Tickseed CASTELLO ™

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

4–5 weeks

70–72 °F (21–22 °C) for the first three weeks

Begin fertilization at 100 ppm N when roots become visible. Rates can be increased up to 200 ppm N after roots become well developed.

First Year Flowering

Erysimum linifolium Wallflower ERYSISTIBLE ™ / SUPER BOWL ™

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

6–7 weeks

70–72 °F (21–22 °C) for the first three weeks

Begin fertilization at 50 ppm N when roots become visible. Rates can be increased up to 100 ppm N after roots become well developed.

1 pinch is recommended, 7–10 days prior to transplant leaving 4–6 nodes.

First Year Flowering

Gaillardia aristata Blanket Flower BARBICAN ™ / SUNRITA ™

VERNALIZATION REQUIREMENT

PROP TIME

BOTTOM HEAT

FERTILIZER

YOUNG PLANT COMMENTS

4–5 weeks

72–75 °F (22–24 °C) for the first three weeks

Begin fertilization at 80 ppm N when roots become visible. Rates can be increased up to 150 ppm N after roots become well developed.

B-Nine ® WSG spray at 2,500–5,000 ppm can be used if needed.

First Year Flowering

GROWER SUCCESS GUIDE 2026–2028

115

Made with FlippingBook Learn more on our blog