Construction Update
Trenching Court Foundations
Courts trenching for retaining walls.
Duct work being installed throughout the clubhouse.
Scaffolding in place. Yellow Dens glass will soon be covered with lath and plaster.
Drywall sheets have been loaded in and installation has begun.
Roofing insulation being installed.
Construction Update
Duct work progress by a mechanical contractor.
Courts grading almost complete.
Progress on the patio.
Lightweight concrete pour on second level elevator area.t
Construction Update
Loading in insulation to Fitness Center
East side construction progress
Building ramp forms
Grease duct being fire wrapped
Lower bar work in progress
Fitness Center HVAC installation progress
Construction Update
Kitchen electrical panel installation
Dining room framing
Framing progress at main level
HVAC duct work being installed in the Pro Shop
Framing at patio extension
Construction Update
Installed mechanical curb
Demolition complete on stucco mechanical well.
Mechanical curbs installed.
Fire Sprinkler lines installation.
Construction Update
Construction Update
Updated Renderings
Demo!
Soft Demo in the Club House
Photo taken from the Lounge patio entrance looking at the Lounge, sunken Lounge bar in the forefront, bathrooms in the background
Photo taken from the Lounge patio entrance looking at the Dining Room, kitchen doors on the left
Photo taken from the Lounge patio entrance looking at the Front door, rest rooms on the left
Photo taken from the Lounge (where the Portesti table sign was) looking at the dining room
Photo taken from the top of the steps coming from the golf shop looking at the dining room
Photo taken from the Lounge from the windows facing #15 tee looking across the dining room to the Terrace Bar patio
Photo taken from the dining room looking across the dining room to the Lounge Bar
Photo taken from the dining room next to the Terrace Patio, dining room on the left, kitchen on the right
Photo taken from the dining room just inside the Terrace Patio, looking into the kitchen
Photo taken just inside the Terrace Patio, looking into the dining room across to the Lounge
Soft Demo in the Club House Temporary Facilities
The Last Look before Demo
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82 Page 83 Page 84Made with FlippingBook - Online Brochure Maker