FC1000/SF1000: EPA 2017 Certification Report

INTERTEK/WARNOCK HERSEY AIR FURANCE EMISSIONS AND EFFICIENCY TESTING LABORATORY OPERATING PROCEDURES pg. 9

Figure 4 – Dilution Tunnel Sample System

VI. FUEL HANDLING AND STORAGE Test fuel is purchased at various sources and once received; the moisture is checked by the Intertek staff. The fuel is then placed in a sealed room with the humidity and temperature maintained at a desired level to equilibrate and maintain the moisture content of the fuel. The room is only opened as necessary to retrieve the fuel for preparation prior to the test.

G:\Hearth\EE - Emissions and Efficiencey\Furnace solid fuel\Lab Procedures for EPA Air Furnaces 11.11.16.doc

Made with FlippingBook - professional solution for displaying marketing and sales documents online