Draft HV Standard Installation & Maintenance Modules

Operations training

High Voltage Standard / V2 PUBLIC HEARING DRAFT 0.1

3. Inspection, Cleaning & Preparation of T- Connectors

3.1 HV cable and breakout inspection 3.2 T-Connectors inspection, cleaning & preparation 3.3 Recognising Critical-to-Quality aspects of equipment 3.4 Reporting any problems TOTAL 4.1 Work instructions for cleaning, preparing and installation TOTAL 5.1 Applying work instructions for inspection, cleaning, preparation and installation of T-Connectors and surge arrestors TOTAL 6.1 Practical assessment: Applying work instructions for inspection, cleaning, preparation and installation of T- Connectors TOTAL

120 min.

4. Guided Practical

Installation Session

160 min.

5. Installation Safe Working Practice Session

200 min.

6. Summative Assessment Practical Installation

200 min.

7. Training review

7.1 Training review 7.2 Feedback session TOTAL

20 min.

GRAND TOTAL

840 min.

9.6 Detailed Description of the High Voltage T-Connector Installation Module

MODULE INTRODUCTION

20 min.

The aim of this lesson is for the participants to be motivated to engage in the GWO High Voltage T- Connector Installation Module safely at a training facility, while recognising what is expected of them during the training.

After having successfully completed this lesson, the participants can:

1) Recognise the course content and the facilities involved to ensure a clear understanding of what is expected of them during the course (Knowledge, basic level)

2) Name and point out local emergency procedures and facilities (Knowledge, basic level)

Global Wind Organisation / www.globalwindsafety.org

112 / 163

Made with FlippingBook flipbook maker