Operations training
High Voltage Standard / V2 PUBLIC HEARING DRAFT 0.1
3. Inspection, Cleaning & Preparation of T- Connectors
3.1 HV cable and breakout inspection 3.2 T-Connectors inspection, cleaning & preparation 3.3 Recognising Critical-to-Quality aspects of equipment 3.4 Reporting any problems TOTAL 4.1 Work instructions for cleaning, preparing and installation TOTAL 5.1 Applying work instructions for inspection, cleaning, preparation and installation of T-Connectors and surge arrestors TOTAL 6.1 Practical assessment: Applying work instructions for inspection, cleaning, preparation and installation of T- Connectors TOTAL
120 min.
4. Guided Practical
Installation Session
160 min.
5. Installation Safe Working Practice Session
200 min.
6. Summative Assessment Practical Installation
200 min.
7. Training review
7.1 Training review 7.2 Feedback session TOTAL
20 min.
GRAND TOTAL
840 min.
9.6 Detailed Description of the High Voltage T-Connector Installation Module
MODULE INTRODUCTION
20 min.
The aim of this lesson is for the participants to be motivated to engage in the GWO High Voltage T- Connector Installation Module safely at a training facility, while recognising what is expected of them during the training.
After having successfully completed this lesson, the participants can:
1) Recognise the course content and the facilities involved to ensure a clear understanding of what is expected of them during the course (Knowledge, basic level)
2) Name and point out local emergency procedures and facilities (Knowledge, basic level)
Global Wind Organisation / www.globalwindsafety.org
112 / 163