Draft HV Standard Installation & Maintenance Modules

Operations training

High Voltage Standard / V2 PUBLIC HEARING DRAFT 0.1

a. Correct and compatible connector and busing types, ratings and sizing

b. No damage to connector or bushing body, surfaces or parts

c. Dimensions, position and orientation alignment of components suitable for making proper connection

d.

All surfaces cleaned and free of contamination

Demonstrate different separable T-Connector products from different manufacturers

Illustrate the importance of proper inspection and cleaning by sharing stories of issues and consequences from past cases of failures and faults

Facilitate participants in a practical exercise to activate learning, for example:

a. break into teams to recall key points in the inspection

b. award points to the group that recall most key points without reference to notes

The participants shall:

Ask questions about key points in a breakout inspection and signs of problems to look out for.

Engage in the practical exercise and quiz fellow participants on key points in a breakout inspection and signs of problems to look for

ELEMENT 3.3 - RECOGNISING CRITICAL-TO-QUALITY ASPECTS OF EQUIPMENT

Learning objectives:

23) Distinguish equipment in proper and improper conditions for proceeding with the cable connection (Skills, intermediate level)

The instructor shall:

Provide several samples of different HV cables, breakout, connectors and components in proper and improper conditions

Lead participants to explore the samples of HV equipment provided using a structured inspection checklist to identify improper conditions

Global Wind Organisation / www.globalwindsafety.org

123 / 163

Made with FlippingBook flipbook maker