Operations training
High Voltage Standard / V2 PUBLIC HEARING DRAFT 0.1
Engage in an inspection exercise with examples of equipment in good and bad conditions and what action to take in each case:
a. complete the required inspection records and report effectively
b. manage a scenario where they need to report problems identified during inspection and are facing undue pressure to proceed
GUIDED PRACTICAL INSTALLATION SESSION
160 min.
The aim of this lesson is to enable participants to practice the skills to perform a safe high-quality HV plug and play connection, by following a work instruction for inspecting, cleaning, preparing and connecting a separable T-Connector to a Type-F Bushing.
The session is intended to provide guided practice opportunities of the instructor to support participants to increase their skills and identify potential faults and errors in their own working.
After having successfully completed this lesson, the participants can:
25) Perform safe and proper inspection, cleaning, preparation and connection of a separable T-Connector to a Type-F Bushing and taking appropriate action to correct errors (Skills, intermediate level)
ELEMENT 4.1 - WORK INSTRUCTIONS FOR CLEANING, PREPARING AND INSTALLATION
Learning objectives:
26) Apply work instructions for cleaning, preparing and installation of a separable T-Connector (Skills, intermediate level)
The instructor shall:
Demonstrate how to apply work instructions to correctly clean, prepare, lubricate and install separable T-Connectors to a Type-F Bushing using two different connector product types
Guide the participants through a practical exercise demonstrating:
a. safe work practices, hazard awareness and mitigation
b.
cleaning and contamination control