Draft HV Standard Installation & Maintenance Modules

Operations training

High Voltage Standard / V2 PUBLIC HEARING DRAFT 0.1

TOTAL

70 min.

4. Cable Inspection

Inspecting the cable for damage during pulling operations How to evaluate damage or puncture holes in outer core TOTAL

4.1

4.2

20 min.

5. Safe working during HV cable pulling operations

5.1

Safe work practices and effective team coordination

5.2

Hazard awareness and mitigation TOTAL

40 min.

6. Preparation of HV cable and tools

6.1

Preparation and protection of HV cable

6.2

Preparation of equipment and tools TOTAL

45 min.

7. Handling the HV Cable

7.1

Installation of cable socks

7.2

HV cable handling and stress control TOTAL

60 min.

8. Conducting the Cable Pulling Operation

8.1

How to pull a HV cable - methods and techniques

8.2

Attention during cable pulling - do's and don'ts TOTAL

90 min.

9. Completing the Cable Pull

9.1

Cable fastening

Installation of the cable loop in tower and walk down and inspection TOTAL

9.2

30 min.

10. Training review

10.1 Training review 10.2 Feedback session TOTAL

10 min.

GRAND TOTAL

465 min.

8.6 Detailed Description of the High Voltage Cable Pulling Module

MODULE INTRODUCTION

25 min.

The aim of this lesson is for the participants to be motivated to engage in the GWO High Voltage Cable Pulling Module safely at a training facility, while recognising what is expected of them during the training.

After having successfully completed this lesson, the participants can: