Draft HV Standard Installation & Maintenance Modules

Operations training

High Voltage Standard / V2 PUBLIC HEARING DRAFT 0.1

b.

group behaviour and peer pressure

c.

weather conditions

d.

weather delays

e.

noise levels

f.

site layout and housekeeping

g.

fitness and health

h.

domestic and work-related stress

i.

workload (both overload and underload)

j.

fatigue

k.

time pressure and deadlines

l.

alcohol, medication, and substance abuse

m. confusing labelling and equipment identification

n.

procedure use

o. use of peer checks with independent and concurrent verification

p.

pre-planning and staging of the workplace

The participants shall:

Engage in discussions and share experiences about how human factors influence accidents when working in the wind industry

Engage in and think on received feedback and take responsibility for their own performance and development during the training

AWARENESS OF BASIC HV CABLE THEORY

60 min.

The aim of this lesson is to provide participants with an awareness of basic HV cable theory and familiarise them with its relevance in cable pulling operations.

After having successfully completed this lesson, the participants can:

Global Wind Organisation / www.globalwindsafety.org

84 / 163

Made with FlippingBook flipbook maker