2023 Highlights Report

HIGHLIGHTS PUBLIC WORKS ROAD MAINTENANCE

BRIDGE MAINTENANCE

407 road signs replaced

Bridge Projects Completed

73,644 tons of asphalt used for paving

Miles Line Striped

176 more than 20 feet long 132 8 to 20 feet long 210 less than 8 feet long Bridge Ratings

Miles Paved

SNOW & ICE REMOVAL 2,140 gallons of calcium chloride used 26,066 labor hours

STORM DRAIN MAINTENANCE 10,971 inlets and outfalls inspected

Salt Spread

SIGN SHOP 1,400 signs produced 36 banners produced 13,600 decals produced

72

Made with FlippingBook Digital Proposal Creator