HIGHLIGHTS PUBLIC WORKS ROAD MAINTENANCE
BRIDGE MAINTENANCE
407 road signs replaced
Bridge Projects Completed
73,644 tons of asphalt used for paving
Miles Line Striped
176 more than 20 feet long 132 8 to 20 feet long 210 less than 8 feet long Bridge Ratings
Miles Paved
SNOW & ICE REMOVAL 2,140 gallons of calcium chloride used 26,066 labor hours
STORM DRAIN MAINTENANCE 10,971 inlets and outfalls inspected
Salt Spread
SIGN SHOP 1,400 signs produced 36 banners produced 13,600 decals produced
72
Made with FlippingBook Digital Proposal Creator