Clean-Resources-IDC-OF-375-instructions

Clean Resources - IDC-OF-375 condensate filter - installation instructions

INSTALLATION INSTRUCTIONS

IDC-OF Series IDC-OF 375 1. Position the unit on its side with the vent facing up. 2. Prime the unit by pouring approximately 5 gallons of water through the vent. Not priming the unit will cause premature failure. 3. Position the unit upright, making sure water drains through the outlet. If the water is not flowing, add more water through the vent. 4. Units are gravity discharged, so the hose MUST lay flat and cannot be submerged in water, or the unit

will not drain. Trim the outlet hose to size. Do not allow airlocks, kinks, or excess coil in the outlet hose.

5. Remove red cap(s), install inlet connector and condensate line.

6. Scan QR code to complete warranty registration.

7. Clear hose MUST remain zip-tied to handle.

Life Span* (Months / Hours † )

IDC-OF (CFM)

375

12 / 8,000

*Months or Hours, whichever occurs first.

† See complete lifespan chart for details: cleanresources.com/IDCOFSeries.html

All Clean Resources products comply with the Buy American Act.

MAX 175 psi

Additional parts are available from Clean Resources.

ü

Avoid damage to couplings. ü

fittings. ü

Check for damage that may have occurred during shipping.

Do not overtighten

COMPLETE WARRANTY REGISTRATION

Questions? Contact your Distributor or Clean Resources: 800-566-0402 • cleanresources.com/contact

v2.0 11-21-2024

Page 1

cleanresources.com

Made with FlippingBook - Share PDF online