Clean Resources - IDC-OF-375 condensate filter - installation instructions
INSTALLATION INSTRUCTIONS
IDC-OF Series IDC-OF 375 1. Position the unit on its side with the vent facing up. 2. Prime the unit by pouring approximately 5 gallons of water through the vent. Not priming the unit will cause premature failure. 3. Position the unit upright, making sure water drains through the outlet. If the water is not flowing, add more water through the vent. 4. Units are gravity discharged, so the hose MUST lay flat and cannot be submerged in water, or the unit
will not drain. Trim the outlet hose to size. Do not allow airlocks, kinks, or excess coil in the outlet hose.
5. Remove red cap(s), install inlet connector and condensate line.
6. Scan QR code to complete warranty registration.
7. Clear hose MUST remain zip-tied to handle.
Life Span* (Months / Hours † )
IDC-OF (CFM)
375
12 / 8,000
*Months or Hours, whichever occurs first.
† See complete lifespan chart for details: cleanresources.com/IDCOFSeries.html
All Clean Resources products comply with the Buy American Act.
MAX 175 psi
Additional parts are available from Clean Resources.
ü
Avoid damage to couplings. ü
fittings. ü
Check for damage that may have occurred during shipping.
Do not overtighten
COMPLETE WARRANTY REGISTRATION
Questions? Contact your Distributor or Clean Resources: 800-566-0402 • cleanresources.com/contact
v2.0 11-21-2024
Page 1Made with FlippingBook - Share PDF online