Included Site Costs & Council and Statutory Authority Requirements
• ‘H1’ class slab in accordance with AS2870.1 - 2011
• Machine hire and site preparation. (Excavate to form a level building platform)
• Remove and dispose up to 1 x load (12.5 tonnes per load) of excess spoil from the excavation of the building platform
• Provide up to 8 meters of single-phase underground service cable from the existing supply authority turret/pillar to the meter box
• Water service connected to the Supply Authorities main located in the near side nature strip
• Sewerage connection to existing junction of supply authority’s main within 8m of the property boundary
• Provide a sewer pegout to determine the precise location and depth of sewer
• Provide concrete piers to a depth of approximately 1 metre to the underside of the slab, to even bearing, as recommended by AS2870
• Provide machine hire for drilling/digging pier holes
• Provide concrete pump for pouring piers
• Drop the garage floor approximately 1 brick course to comply with Council’s driveway gradient
• Provide 40m of temporary protective fencing as required to comply with Clause 235 (site security - particular risk control measures) of the Occupational Health and Safety Regulations 2000
• Stormwater drainage lines and connection to kerb or existing easement within 8m of home. (Note: This is subject to council approval / hydraulic design)
• Provide a Landscape Plan in accordance with the Developers requirements