GWO BTT v6.0

GWO Basic Technical Training V6.0

2021-04-01_TS_BTT_V06

(if done after other BTT module)

5 min.

2

Introduction to Installation 2.1

Installation overview

2.2

Why installation safety?

2.3

Safety signs

2.4

Types of PPE

2.5

The importance of appropriate isolation TOTAL

55 min.

3

General procedures for working onsite with installation

3.1

Checklists, Work instructions, etc.

3.2

Housekeeping

TOTAL

30 min.

4

Installation environments

4.1

Installation environments

TOTAL

45 min.

5

Handling and storing

5.1

Risks and hazards associated with handling and storing

5.2

Reception / Inspection

5.3

Unloading and storage of blades, nacelle, tower sections & hub

5.4

Tools and equipment

5.5

Return of goods and components TOTAL

70 min.

6

Lifting operations

6.1

Types of lifting

6.2

Risks and hazards associated with lifting operations

6.3

Roles and responsibilities TOTAL

100 min.

7

Main component preparation, pre-assembly and assembly

7.1

Preparation, pre-assembly and assembly

7.2

Risks and hazards associated with main component preparation, pre-assembly and assembly Challenges when assembling the main components TOTAL

7.3

50 min.

Global Wind Organisation www.globalwindsafety.org

110 / 158

Made with FlippingBook - professional solution for displaying marketing and sales documents online