GWO Basic Technical Training V6.0
2021-04-01_TS_BTT_V06
(if done after other BTT module)
5 min.
2
Introduction to Installation 2.1
Installation overview
2.2
Why installation safety?
2.3
Safety signs
2.4
Types of PPE
2.5
The importance of appropriate isolation TOTAL
55 min.
3
General procedures for working onsite with installation
3.1
Checklists, Work instructions, etc.
3.2
Housekeeping
TOTAL
30 min.
4
Installation environments
4.1
Installation environments
TOTAL
45 min.
5
Handling and storing
5.1
Risks and hazards associated with handling and storing
5.2
Reception / Inspection
5.3
Unloading and storage of blades, nacelle, tower sections & hub
5.4
Tools and equipment
5.5
Return of goods and components TOTAL
70 min.
6
Lifting operations
6.1
Types of lifting
6.2
Risks and hazards associated with lifting operations
6.3
Roles and responsibilities TOTAL
100 min.
7
Main component preparation, pre-assembly and assembly
7.1
Preparation, pre-assembly and assembly
7.2
Risks and hazards associated with main component preparation, pre-assembly and assembly Challenges when assembling the main components TOTAL
7.3
50 min.
Global Wind Organisation www.globalwindsafety.org
110 / 158
Made with FlippingBook - professional solution for displaying marketing and sales documents online