4. BTT INSTALLATION MODULE

The following equipment is required during the entire duration of this training to meet the needs of the BTT Installation Module:

PPE suitable for installation work (gloves, safety googles, safety coverall googles that can be worn on top of prescription glasses), safety shoes or working boots and protective work clothing)

Spanners

Torque wrenches

Sockets

Screwdrivers

Cable ties

Heat shrinks / cold shrinks

Hexagon (Allen) keys

Tool set for cutting, stripping and crimping small cables (smaller than 6mm2) – 1 set for 2 delegates Tool set for cutting and stripping main cables (massive & core conductors, bigger than 35mm2) – 1 set for 2 delegates Tool set for crimping wires bigger than 35mm2 (electric or electro-hydraulic) – 1 set for 4 delegates Log Out Tag Out kit (this kit should not be required if not needed considering the setup available for the practices)

Mock-up for cable work including:

a. Electrical cabinets with standard DIN rails for mounting terminals (clamp, screw type)

b. Clamp, screw type terminals

c. Cable glands

d. Cable trays

e. Bus bars (copper) with holes to connect cables with cable lugs

Any equipment used during this GWO training module shall meet or exceed the minimum requirements of the national standards in the country where the training is taking place. When working in a country where there is no applicable national standard then the equipment shall meet or exceed the minimum requirements of the European standards.