GWO Basic Technical Training V6.0
2021-04-01_TS_BTT_V06
a. Incoming inspection of components
b. Unloading
c. Storage and preservation
d. Repair
e. Preparation
f.
Pre-assembly
g. Lifting / assembly
h. Tightening
i.
Cable work
j. Finishing (Mechanical, Hydraulic and Electrical)
The participants shall:
ELEMENT 2.2 - WHY INSTALLATION SAFETY?
Learning objectives:
The participants can describe how to identify known and suspected hazards involved in the installation of turbines (Knowledge, basic level) The participants can describe the health risks associated with the hazardous situations (Knowledge, basic level) The participants can describe the means to reduce the exposure to acceptable levels (Knowledge, basic level)
The participants can discuss the importance of installation safety (Knowledge, intermediate level)
The instructor shall:
a. All sources of hazardous situations, e.g. electricity, dropped objects, crushing damage, sharp items, toxic materials and/or substances used in the workplace
b. Tools/equipment malfunctioning due to poor control and/or handling during installation.
Global Wind Organisation www.globalwindsafety.org
116 / 158
Made with FlippingBook - professional solution for displaying marketing and sales documents online