M id A tlantic Real Estate Journal β DelMarVa β December 2025 β 7A
www.marej.com
D el M ar V a
Five-month fast-track fit-out follows ground-up delivery Blue Rock completes 358,000 s/f distribution project for First Industrial in Claymont, DE C
LAYMONT, DE β Blue Rock announced the completion of both the ground-up construction and the comprehensive fit-out of a 358,000 s/f distribution facility at First State Crossing in Claymont. This project represents an- other strong chapter in Blue Rockβs ongoing partnership with First Industrial Realty Trust , a leading owner, opera- tor, and developer of logistics real estate. Complete Delivery Blue Rock delivered the rear-load warehouse as part of the broader First State Crossing redevelopment, a transformative 420-acre proj- ect turning a former steel mill site into a modern industrial and commercial hub. The facility features: β’ 40-foot clear height β’ 68 dock positions, two ramp doors, and 241 trailer parking stalls β’ Strategic proximity to I-95, I-495, and Philadelphia International Airport Following completion of the building, Blue Rock was select - ed to provide a full interior fit- out tailored to the operational needs of First Industrial Real- ty Trustβs tenant, ensuring the facility was fully prepared for occupancy and performance. Fast-Tracked Fit-Out Originally scheduled as an eight-month effort, the fit-out was successfully com - pleted on an accelerated five- month timeline. Blue Rock worked closely with the tenant and owner- ship team to meet the revised schedule while maintaining the highest standards of qual- ity and functionality. The fit-out scope included: β’ A new 12,000 s/f office β’ An 11,000 s/f maintenance shop β’ Renovations to an existing 5,000 s/f office β’ Infrastructure upgrades such as battery-charging sta- tions, high-volume, low-speed fans, and modified dock equip - ment for larger levelers β’ Site improvements, in - cluding perimeter fencing, a guard shack, and updated building signage Longstanding Partnership Blue Rock values its part - nership with First Industrial Realty Trust, having teamed together on multiple projects totaling nearly 4 million s/f in the NE. Recent projects include:
358,000 s/f distribution facility at First State Crossing in Claymont, DE
PA β (2) buildings totaling 1,783,800 s/f First I-78/81 Logistics Center, Jonestown, PA β (2) buildings totaling 988,920 s/f
First Park New Castle β Building B, a 225,680 s/f facili - ty currently under construction First Logistics Center @ 283 , Londonderry Twp.,
Bordentown, NJ β 119,800 s/f First Bordentown Lo - gistics Center, Rising Sun Road, Bordentown, NJ β 208,000 s/f MAREJ
First 33 Commerce Center, Northampton County, PA β (2) buildings totaling 584,000 s/f First Park @ Central Crossing β Building III,
Celebrating over 30 years as the premier construction manager and design-builder in South Jersey.
βBlue Rock Construction was able to listen to and, more importantly, understand our wants, needs, and critical restrictions in order to customize a build that fit our budget and operational restraints.β Theo Roustopoulos, Kast Distributors and US 4 Realty, LLC
1712 Hancock Lane, Burlington, NJ 08016
(609) 747-7758 www.blrck.com
Made with FlippingBook - professional solution for displaying marketing and sales documents online