NEWSLETTER 2020
‘Proud and impressed with our industry in this year that was 2020. From the wisdom of clients and leaders from our main contractors, commitment frommanufacturing & distribution and the “never say die” attitude of every person on the ground, let’s continue to hold our heads high and help all our economies back to full health in 2021. Our governments should look to leaders in our industry and do right by all the people from across Europe and beyond, look outward, not inward and we will grow together’ Damien Treanor - Director
Company Newsletter
EY ENTREPRENEUR FINALIST 2020
Earlier this year, Cormacwas named as a finalist in the prestigious Ernest &Young Entrepreneur of the Year awards.We are extremely proudof Cormac formaking the shortlistwhich contained some of the best entrepreneurial talent in Ireland and the support he received from his team at Errigal, our suppliers and clients was second to none throughout the campaign.
“It was a real honour to be selected and to share this achievement with my family and friends”
Cormac has been quick to share this achievement with the team at Errigal and beyond, acknowledging that it’s our people that are the absolute core of our growth and success. Not only our staff but also our dedicated workforce of over 1,500 and all our partners in business. It is this commitment, care, and knowledge of our people and their dedication to the industry that distinguishes Errigal in the marketplace.
Virtual Awards Night with Family
Virtual Awards Night ready to go live
Errigal
BUILDING FOR THE FUTURE
Antrim Business Park
It has been a year to remember for us all, allowing us some breathing space to step back and consider how we continue to develop, grow and protect our business for the future. As part of that vision for the future we are excited to be working with local Government bodies and community leaders to bring life back into the former Enkalon site in Antrim.
Aerial view Enkalon site mid 1960’s
Enkalon Site 1964 almost at completion
We are now in the planning stages of some exciting developments at our Antrim site and we are looking forward to sharing more details about our 5 year investment plan in 2021. Our vision is to create a centre of excellence and encourage companies with a similar outlook to work even closer together, with a view to putting Northern Ireland at the forefront of research and development for off-site construction.
Cormac pictured at Enkalon site
Cormac pictured in the Enkalon warehouses
Company Newsletter
HEALTH & SAFETY UPDATE
2020 has brought a host of new changes and learning opportunities to all of us at Errigal, but the one thing that has remained consistent is our commitment to ensuring that the Health, Safety and Wellbeing of our entire workforce is still the number one priority. Now, more than ever, we understand and endeavour to spread the message that the actions and decisions we make at work can have a huge impact on each of us as individuals as well as our families and friends. The message of ‘Safety First’ is one that we continually promote across the whole company.
CIF Construction Safety Week 2020
We are continuing to enhance our standards across the business to promote safe working practices on all our sites and to ensure that each person working at Errigal goes home safe and healthy every single day. On the 19th-23rd October, our site teams got involved with the CIF Construction Safety Week in Ireland. This was an brilliant event that involved engaging workshops and encouraged some excellent discussions on topics around mental health, welfare and wellbeing at work, working at height and occupational health in construction. These are important topics which we will continue to promote awareness of across all our sites.
DIT workshop for CIF Construction Safety Week
Townsend St. workshop for CIF Construction Safety Week
Wuxi workshop for CIF Construction Safety Week
Errigal
Mental Health and Wellbeing 2020 has seen us all face unprecedented times of uncertainty which undoubtedly has brought undue stress to many and we recognise that this can have a huge impact on our mental health. We understand the importance of promoting positive mental health and wellbeing within our company and across our workforce to ensure that each person in Errigal can be both physically and mentally safe in the workplace and at home with their families. At Errigal, the health and wellbeing of each person in the Errigal community is our number one priority and while we are committed to creating continued awareness around topics such as mental illness, depression and suicide in construction, we are dedicated to working together to start promoting the importance of focusing on developing mental wealth within our company and the industry as a whole.
Darkness into light and Suicide Prevention
Due to Covid-19 the official Darkness into light walk was cancelled, however members of Errigal team came together to do some socially distanced walks in their local areas to support this great cause and promote suicide prevention and positive mental health.
Errigal staff enjoying a morning walk
Sunrise captured by employees finishing walk
Face Fit Testing A company-wide toolbox talk was also carried out on Suicide Prevention Day on the 10th of September to talk about the issues surrounding mental health and suicide in our industry and how we can spot the signs of those who may need help. We will continue to have the conversations on this important topic and hope that we will all be able to walk together again at Pieta’s event next year.
DIT suicide prevention toolbox talk
Townsend St. suicide prevention toolbox talk
Wuxi suicide prevention toolbox talk
www.errigalcontracts.com
Recognition Corner Maintaining the highest standard of health and safety on all our sites is of the utmost importance and it is great to see our Errigal site teams being continuously recognised and rewarded for demonstrating excellent health and safety practice on site. Well done to all those who received safety awards this year and we are looking forward to seeing many more health and safety award winners in 2021.
Exceptional work was carried out by Multiplex and all their teams on 22 Bishopsgate. An exemplary level of safety was maintained throughout the project and Errigal was honoured to be recognised and awarded first place in the subcontractor safety league by Multiplex earlier this year. L: Andrew Feighery, Multiplex - Director R: Alan Broderick, Errigal - Contracts Director
Well done to all Errigal operatives who have been recognised this year for their commitment to looking after not only their own safety but the safety of others on site. Congratulations to David (above) who received award for excellent H&S compliance and best safety observation by Collen onWuxi Dundalk L: David Bailie, Errigal - Fixer R: Martin Kirrane, Collen - Project Manager
Well done to the Errigal team for being awarded the September Safety & Quality Award by Sir Robert McAlpine on Victoria Square, Woking. L: Tony Smith, SRM - Project Engineer R: Chris Ignat, Errigal - Site Manger
Site team on Project Laureate Cambridge
Congratulations to the Errigal team on Project Laureate in Cambridge who were presented the ‘Trade Contractor Team of the Year’ at the project’s Health, Safety and Wellbeing awards in February.
Errigal
OUR COMMUNITY Our community is very important to us at Errigal and we believe in supporting our local communities from schools to sporting clubs and local infrastructure. We will continue to support and encourage community development at all levels.
St. Colm’s GAC Drum
St. Patrick’s Hurling Club
Kevin Lynch’s Hurling Club
Truagh Ladies CLG
St. Joseph’s GFC London
Errigal are proud to continue our long-standing sponsorship with Truagh Ladies CLG Football Club, Kevin Lynch’s Hurling Club, St. Patrick’s Football & Hurling Club, St. Colm’s GAC Drum and St. Joseph’s GFC London. In 2019 Errigal was proud to sponsor HMS Ordacious, Dylan Woods, Hugo Mitchell-Heggs, Callum Fraser and Matt Harvey on their 3,000 mile row across the Atlantic Ocean. In January 2020 they completed the Atlantic Challenge 2019 in 36 days, 6 hours, 40 minutes! They have also now raised over £105,000 for charity to provide Mental Health & Wellbeing support to their Submariner community (serving veterans and their families). Atlantic challenge
Company Newsletter
OurWinter Charity Swimwas a great success for everyone involved. Unbelievable generosity towards the Michaela Foundation was shown by everybody and a great team building experience for all the Errigal Warriors who took part. Winter Charity Swim - Michaela Foundation
First of the brave warriors
Errigal staff on their way to the big dip
Errigal daredevils taking a leap!!
No baths required tonight!!
We are proud to have raised over €9,000 for the Michaela Foundation who work with young people to instil confidence and belief in themselves and they in turn promote a positive influence throughout local communities.
No one rushing back to the office after the cold dip
Well done to all Errigal Warriors
Errigal Contracts
ERRIGAL WOMEN IN CONSTRUCTION
According to Go Construct 37% of new employees choosing construction after university are women and approximately 14% of all construction industry professionals are now female. The days are long gone where construction was seen as a male only industry and we are delighted to see and embrace this change. We want to encourage more women to come into the industry at all levels. There is so much room for career progression and skill development, it’s an industry worth looking into no matter what your background. If you are career-driven and you thrive on challenges that lead to success then Construction is the platform for you. A diverse and ever evolving industry and it’s an empowering environment for women to thrive. It is a career path where hard work pays off and one that is full of opportunities and challenges that push you to grow and be your best every day.
Company Newsletter www.errigalcontracts.com
TRIBUTE TO MARTIN Martin Hasson 1965-2020
In July of this year we lost one of our own. Martin was with us from the very start and throughout the growth of the company. Martin managed some of the most complex and intricate projects we have worked on to date. Martin never shied away from a challenge and constantly delivered, no matter what, and this rightfully earned him the nickname “Millimetre Martin” from all his colleagues.
Martin with wife Clare at Errigal Christmas Party
Happy memories on site at Galaxy House London
Martin sharing a beer with colleagues
End of year celebrations
Martin is, and always will be, remembered as a key member of the Errigal family and has left behind a legacy of whichhiswifeClare, sonCharlie anddaughter Ramona shouldbe very proud. Martin always knew the importance of bringing on the younger generation and was always generous with his time and he embraced the opportunity to be able to share his technical knowledge and years of experience on a daily basis with the young staff and apprentices who he worked along side. Believing in young people and wanting to see them do well is a belief that Martin shared with us and in acknowledgment of this Errigal are dedicating the annual apprenticeship award in Martin’s memory. The “Martin Hasson Apprentice of the year Award” will be presented annually to the stand-out apprentice each year.
Errigal
ERRIGAL TRAINING ACADEMY
Errigal Training Academy Training is at the forefront of everything that we do. We believe in our young people and we want to empower everyone who works with Errigal to be the best that they can be.
The Errigal apprenticeship has been operating now since January 2016 and we are extremely proud of all the young people who have completed their apprenticeship successfully and it’s great to see some of our qualified apprentices moving up through the ranks and becoming a member of site management team. Errigal are committed to training and upskilling to the highest possible standard within the industry, for the good of the industry as a whole.
From January 2016 we have had 12 groups of apprentices over the last 5 years and even with the unusual times of Covid-19 that we find ourselves living in today, Errigal are still committed to providing that opportunity for young people seeking a career and wanting to better themselves. We have a dedicated team in our training department who focus not only on professional skills, but on personal development and life skills, allowing young people to find a career they enjoy, stability for the future, career progression, and a sense of achievement and pride.
Company Newsletter
It may be the year of online tutorials, lectures and the virtual University experience but the Errigal Undergraduates are taking it all in their stride and are availing of every opportunity to excel in their studies and careers. These young professionals have their feet firmly on the ground and we are very proud of the enthusiasm they bring to our company and to the industry. Keep up the good work everyone, the future is bright. Undergraduate Programme ERRIGAL DEGREE PROGRAMME
This year more than ever we need as an industry to demonstrate our commitment to the future development of our young professionals. Well done to all at Errigal who continue to lead by example and in conjunction with our universities have given six young people the opportunity to take their placement year with us and help them on their personal journey to achieve their goals Damien Treanor
‘Really enjoying my year out on site and getting great experience already, actually feel l am important to the team. I see first-hand the knowledge gained by my peers who took the decision a couple of years back to take their degree full time with Errigal, if I was doing this again this is the path I would take’ Ryan Scullion - Placement Student
Errigal
ERRIGAL FACADES
We are delighted to be working on one of the largest regeneration sites underway in London. Brunel Street Works is our flagship facade project where works have been continuing at a rapid pace throughout 2020. These striking buildings adjacent to Canning Town station will form a prominent feature for years to come on the London skyline, whilst delivering 975 mixed tenure homes along with commercial and retail space. The full development is spread across 5 blocks ranging in height from 8 to 26 storeys. We have been working in conjunction with Vistry Partnerships since late 2017 on the scheme providing preconstruction advice on design, constantly testing the decisions and ensuring the most economical build. Brunel Street Works Gebrik Cladding PPC I-Beam Fascias and Balustrade install Curtain Wall & GRC feature surrounds PPC Rainscreen Cladding & window install
Brunel Street Works Project - November 2020 works continue at pace across all elevations, with scaffold strikes well advanced on the completed blocks
Our scope of works (circa £48m) on this project is varied and challenging and is a real testament to our teams capabilities and knowledge in delivering excellent quality across all through-wall solutions.
www.errigalcontracts.com
ERRIGAL RECLAD
Due to the on-going demand and critical importance of safe recladding of buildings across the UK and beyond, we have been focused on building our knowledge and expertise in this area and in 2020 have set up a specialist recladding division with a dedicated delivery team. We are equally adept at delivering one specific element of the process outlined below, to taking the lead on the whole project as a one-stop-shop. We are proud to have successfully delivered this service to many clients within the last year, with several projects in progress.
Stage One : Inspection We complete a thorough inspection of the existing façade. Cladding panels are removed and the existing system, insulation, fire barrier and support system is surveyed and a detailed report issued.
Stage Two : Design Our design team work with all involved from main contractors and clients to consultants and certifying bodies to: •Review the existing building line and interface requirements. •Review the design of the building and proposed re-clad materials to maintain the aesthetics of the building. •Develop the re-clad design details for the projects based on the architect’s intent. •Confirm structural analysis of proposed systems •Advise on compliance of systems to current standards and requirements on testing if required.
Errigal
Stage Three : Testing We design, construct and facilitate the testing of existing or proposed facade solutions to verify and certify that the proposed remedial solution will pass the relevant building regulations and testing parameters. We have fully constructed and tested a total of 15 fire test rigs in accordance with BS8414 for various cladding systems and bespoke designs.
‘I am proud of the development of our façade expertise across all areas from design to final installation, building relationships with professionals and contractors in our industry and with Grenfell always on our minds it is important that we have compliance at the forefront of all decision making’ Brendan Treanor - Contracts Director
Stage Four : Final Specification Errigal consults with the architect and client to provide options and select and specify a suitable replacement cladding material that will meet performance and the aesthetic finish to the facade. Working closely with supply chain to model and fabricate replacement cladding to match the profile and building line of the existing façade. Ensuring quality Quality Assurance procedures are maintained at all stages.
Routing ACM( aluminium composite material
Mech-slip brick slip cladding
Stage Five : Installation Re-clad works are carried out in a sequenced manner. Isolated areas are ‘stripped’ and reclad in single visits to minimise the building envelope exposure and impact on residents, businesses and general public. Quality assurance inspection and reporting is conducted at each stage to ensure installation is carried out in accordance with the design, specification, testing and quality requirements.
‘Failure of our product is what we all strive to prevent in our industry every day. We have leaned on the expertise within our company over previous years and built a team that will face the challenges and address any deficiencies. Our team can deal with everything from initial inspections & reports, development & testing solutions, logistics & access to final strip & installation. Having no legacy projects in this field has allowed us to approach this with clarity of mind and resolve’ Chris Hodgkinson - Contracts Director
Company Newsletter
TESTING AND DESIGN
Fire Testing
We have continued building upon our vast testing experience this year and have carried out a number of Facade (BS8414) and Internal Partitions (BS476 Part 22) fire tests with our long established manufacturing partners. These tests were carried out at the Efectis Facility in University of Ulster. We will continue our testing in 2021.
BS476 party wall test specimen
View of test rig with thermo couples in place
Live output results from the test specimen
A view from inside the furnace
Design Capabilities
City Tower One Nine Elms On this residential project Errigal are required to prototype the building in the virtual environment in accordance with UK BIM standards. Producing a fully coordinated BIM Model allows Errigal to “Clash Detect” with the various other trades eliminating site conflicts and increasing site productivity. Errigal has the ability to use this model to review build sequences, schedule and quantify materials to their specific locations and using a digital tablet to superimpose the design on site.
One Nine Elms 3D Coordination
Site team setting out.
‘BIM to site and back again.’ We can now relay setting out information from our developed 3D models to robotic total stations in the field. This allows us to precisely set out all elements from the model, then load any alterations due to site variations back in the model to produce an “As Built” model.
Errigal
FEATURED SECTOR
Data Centers
Times have changed, just a few decades ago society was content with television broadcasts with a few channels to choose from. This however is not the case anymore with hundreds of TV channels and ever changing communication methods, this has facilitated the need for Data storage. Data centers are facilities where hardware and software for the storage of information in centralised locations and data is moving in and out of these facilities on a constant basis. In a challenging year in the construction industry as a whole and no less so in the mainland European markets where Errigal have been involved in the construction of data centers since 2013. Our works have evolved from a targeted approach for partitions and ceilings to full fitout and complete facade envelope solutions including full BIM design responsibility . This year alone we have delivered in excess of 90 Mw over 170,000 m2 across eight projects in four mainland European countries.
‘In recent years we have broadened our offering to our clients across Europe. Our full architectural fitout service has gone from strength to strength, with credit due in no small part to our on site delivery teams, technical and
design teams and all our people’ Mark Landers - Contracts Director
www.errigalcontracts.com
EUROPEAN PROJECTS
ODN1
FRA13
LOCATION: Denmark CLIENT:Mace/Facebook SECTOR:Data VALUE: Circa €9m
LOCATION: Frankfurt CLIENT: DPR/Digital Realty SECTOR:Data VALUE: Circa €7.5m
Our 2nd project on this campus has cemented the real and true nature of teamwork and a collaborative effort from all partners in the delivery of this complex and fast paced data centre. We look forward to the future works with DPR, our supply chain and our own teams once again in Frankfurt in 2021!
This year we successfully delivered the second phase of this hyper scale data center campus in Odense Denmark.
SH4
ZRH11
LOCATION: Zurich CLIENT: DPR/Safehost SECTOR: Data VALUE: Circa €8m
LOCATION: Zurich CLIENT: DPR/Vantage SECTOR:Data VALUE: Circa €6m
We have been entrusted with the delivery of this 9 MW data center north west of Zurich. It involves the full fitout of the data halls and administration building, including structural ceilings and epoxy floor paints.
We have been awarded the full fitout of the 8 Mw Data center east of Zurich. Our scope includes external acoustic soffit treatments, structural ceilings, epoxy floor painting and partition packages.
Errigal
University Of Sussex FEATURED PROJECTS
We are delighted to have completed the full design, supply and install of the render system, brick facade with aluminium powder coated flashings and copings on this East Slope project. This modern complex has given the University of Sussex campus in Brighton over 2000 student rooms across 31 blocks providing an aesthetic link to the campus’s existing buildings. We also provided the drylining and ceiling finishes to the internals on selected blocks. Many challenges were overcome in Errigals three years programme period working as an integral part of Balfour Beatty’s team in delivering the final product to their client. The works were carried out in five phases over the duration with a combined value of circa £10m.
‘Great to reflect on a journey well made as we bring this project to a close in 2020. From working in the beautiful south coast region, seeing off site and on-site construction brought together to deliver this impressive student campus, I am proud of all our team and how they have developed over the past 3 years, really looking forward to working with Balfour Beatty ‘s team on the next phase when we head west sometime in the future’ Peter McCloskey - Construction Director
Aerial view of the 31 student buildings
Alsecco brick work and render finishes
Alsecco finishes incorporating aluminium copings
Ozeon Copper panels installed to lift tower
Company Newsletter
Palace Street is a development by London’s leading luxury property developer Northacre, offering a rare opportunity to live opposite Buckingham Palace. This impressive architectural design combining original facade with new extensions on the 41,000 sq ft island site located in one of London’s most sought after neighbourhoods.
‘ This project has been a challenge and a half for everyone involved, we are proud to be part of this journey. Relationships built over the past two years will keep me strong & focused into the future. Great to see the commitment from Balfour Beatty and all their supply chain on the same path to deliver this wonderful project for the summer of 2021’ Conor Matthews - Contracts Manager
No 1 Palace Street
Errigal Contracts,workingwithother supply chainpartners supportingBalfour Beattywith their delivery of 72 luxury high end apartments, completion August of 2021. Errigal are responsible for partitions, ceilings and fire-stopping packages as well as the screed and secondary steel works. This challenging project boasts a mixture of triple, duplex and town house apartments also an impressive gym, swimming pool and treatment spa area.
Lounge Area - 1 Palace street
Master bedroom - 1 Palace Street
Living area - 1 Palace Street
Bathroom- 1 Palace Street
Errigal
SELECTION OF COMPLETED PROJECTS 2020
St. Enoch’s Cinema, Glasgow
22 Bishopsgate, London
LOCATION: Glasgow CLIENT: Sir Robert McAlpine SECTOR: Commercial VALUE: £2.5m
LOCATION: London CLIENT: Multiplex SECTOR: Commercial VALUE: £27m
Rising above the skyline in the city of London, 22 Bishopsgate has now achieved practical completion after many years of commitment from all involved. The impressive entrance lobby spanning over 3 levels is the perfect first impression of this magnificent structure.
As part of an 865,000 sq ft shopping centre redevelopment, Errigal worked on a new nine- screen VUE cinema taking up 29,000 sq ft. Our scope included partitions, acoustic ceilings and a bespoke entrance facade.
Lancaster Gate, Birmingham
M7 Stratford, London
LOCATION: Birminghan CLIENT: McAleer & Rushe SECTOR: Residential VALUE: £4m
LOCATION: London CLIENT: Westfield SECTOR: Commercial VALUE: £4.3m
In the heart of Stratford East London this 13 storey high spec office development for Westfield Europe Ltd and their valued client was completed in early 2020. This category A fitout, across all floors, boasts a double height reception foyer with a glazed central atrium and a 9,000 sq ft roof garden. All works completed to programme and within budget.
Situated adjacent to Aston and Birmingham City Universities, this 1,023 bedroom student accommodation development occupies a prominent site in the heart of Birmingham city centre. Errigal completed the partitions and ceilings as part of the overall project delivery.
www.errigalcontracts.com
CURRENT UK PROJECTS
Damac Tower, London
Hounslow Cinema, London
Location: Hounslow, West London Client: Barratt London Sector: Commercial Value: £2.7m
Location: Vauxhall, London Client: Multiplex Sector: Residential Value: £14.5m
This commercial and retail development in Hounslow forms the centre piece of this impressive Barratts London project, which boasts a 10 screen cinema for their client Cineworld. Errigal will complete their fitout works during December 2020 deliveringtheprojectonprogrammeandonbudget.
This dynamic 50-storey residential tower on London’s south bank at Vauxhall represents all that is great in modern architectural design both exterior and interior. Damac Tower provides the 360 residential units with all the amenities associated with a state of the art development. Errigals fitout works are due for completion in quarter 2 of 2021.
Camden Town Hall, London
One Nine Elms, London
Location: Camden London Client: Lendlease Sector: Commercial Value: £4.5m
Location: Vauxhall, London Client: Multiplex Sector: Residential & Commercial Value: £11.5m
Refurbishment of the historic grade 2 listed Camden Town Hall commenced in September 2020. We are proud to be a part the Lendlease team in bringing this building back to its former glory. The town hall’s main Judd Street entrance will be refurbished along with a new reception area. The building services will be upgraded with the office space being reconfigured across all floors.
One Nine Elms development for R&F Properties will be a major landmark on the Vauxhall skyline for years to come. Errigal commenced their scope on the 56 storey City Tower in quarter 4 of 2020. Works will accelerate at pace during 2021 with completion the following year. Looking forward to working closely with Multiplex and their supply chain.
Errigal
CURRENT IRISH PROJECTS
Dorset St. Hotel, Dublin
Belfield Office Park, Dublin
LOCATION: Dublin CLIENT: StructureTone SECTOR:Commercial VALUE: €0.8m
LOCATION: Dublin CLIENT: Duggan Brothers SECTOR:Hospitality VALUE: €1.2m
Dorset St. Hotel is located on the site of the famous North Dublin Tavern ‘The Big Tree’. This develop- ment will see the former pub being converted into a 163-bed hotel, ground floor mixed-use retail area and restoration of the pub. Errigal are currently installing partitions and ceilings with completion due early 2021.
Belfield Office park is an office development located in Dublin 4. The original development which was complete in 1999, is currently under a phased redevelopment and Errigal are installing the partitions and ceilings to the cores of the building with completion due late 2020.
Townsend Street, Dublin
Fibonacci Square, Dublin
LOCATION: Dublin CLIENT: John Sisk & Son SECTOR: Commercial VALUE: Circa €4.5m
LOCATION: Dublin CLIENT: John Paul Construction SECTOR: Hospitality VALUE: €5.3m
This Dublin campus provides an 870,000 sq ft modern office development for the social media giant Facebook. Looking forward to our continued strong working relationship with John Sisk & Son Ltd in bringing life to this historic site in Dublin 4.
The project will consist of a 393 bed hotel for Travelodge, a 136 bed Aparthotel and a 66 bed Aparthotel for two separate clients. Errigal are currently completing the external facade, partitions &ceilings. Theproject is currentlyunder construction with a completion date of early 2021.
Company Newsletter
SUPPLY CHAIN Thank you to our suppliers, manufacturers & distributors for your support in 2020 and we very much look forward to working with you throughout 2021.
Errigal
CLIENTS
Thank you for the opportunity to work with you and we look forward to many new ventures in 2021 and beyond. To our clients
www.errigalcontracts.com
ERRIGAL BY NUMBERS
Financial Roundup
In a year of disruption and uncertainty it gives satisfaction to all associated with Errigal that we are able to report strong financial performance for 2020. We have a strong pipeline secured for the year ahead and with our continued expansion in mainland Europe and our investment in off-site manufacturing we look forward to continued success in the years ahead.
17 clients across all projects
15 projects in Ireland 2 new clients 39 projects in the UK
Circa £122m Turnover 2020
£132m Projected Turnover 2021
£82m Turnover Secured 2021
12 projects in mainland Europe
‘Reflecting at this point on the year “2020” is difficult with the major disruption to our economies and communities, the achievements of our people at Errigal may be reflected in the financial performance, however the greater impact of their commitment will only be realised fully in the immediate years to come, the challenges of Brexit and Covid-19 are at the forefront of our thoughts and we need to stay strong and focused as we prepare for our return in 2021’
Next Phase...
Our desire to recruit the best people possible has enabled us to put in place an experienced leadership team to support the current and planned growth for our business.
£122m
2020
2021
£132m
Secured
Pipeline
Capacity
Errigal
NEW TEAM MEMBERS
A big Errigal welcome to all who joined our company throughout the year. We know that your experience and knowledge will complement an already hard-working and dynamic Errigal Team.
Gauri Kenkre
Helena Cosgrove
Barry McCrossan
Geraldine McAdam
Ryan Quinn
Liam Jennings
Graham Bennee
Graham McCracken
Katie Curley
Sam Roe-Barnett
Paul Mullen
Paul Raescu
Ryan Scullion
Jack Moore
James O’Kane
Odhran Potter
Neil Dawson
William Carroll
Seamus O’Kane
Shane Conlon
Sean McCormack
Company Newsletter
“If we can winter this out, we can summer anywhere” Seamus Heaney
Ardginny Killybrone Co.Monaghan H18 VH93 Ireland
111GortnagheyRd Dungiven Co.Derry BT47 4PZ
EstraHouse StationApproach Streatham London SW166HW
IRL +353 (0) 47 70709
NI +44 (0) 28 777 40066
UK +44 (0) 203 9616 560
Errigal Contracts
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28Made with FlippingBook flipbook maker