GCASD Feasibility Study_District Campus 24.02.21

STADIUM BLEACHER ADDITION

Additional bleacher seating to be added to the home side is being considered on the eastern side of the existing bleacher structure, between the bleachers and the existing light pole. The area will accommodate a 25’ wide by 15 row unit, approximately 150 seats.

Bleacher Addition Cost Projection  Bleachers (150 seats)

+/-

$60,000

Contingency 15% +/-

$ 9,000

Estimated Total:

+/-

$69,000

. STADIUM PERIMETER FENCE REPLACEMENT

The existing stadium perimeter fencing in specific locations is corroded, in disrepair and has exceeded its usable life. Replacement is warranted on the east, west and south sides. Black vinyl fencing is recommended for replacement.

Fencing Replacement Cost Projection  Demolition

+/- +/-

$10,000 $72,000 $82,000

 Replacement Fencing (+/- 1580’)

Sub-Total: +/-

Contingency 15% +/-

$12,300

Estimated Total:

+/-

$94,300