Recladding Services Digital Brochure

Recladding Services

Testimonial

Project: Vistry Partnerships

Project: Galliford Try Construction North West Galliford Try worked with Errigal Contracts on a re-cladding project at a private development in the heart of Manchester and would have no hesitation in recommending them or working with the team again in the future.

Errigal Contracts carried out the reclad works of the White City building in 2019.

The works included the removal of the existing cladding and replacement with PPC aluminium cassettes along with the complete fire barrier remedial works in line with current regulations. We turned to Errigal after developing an excellent working relationship with them on another project at Brunel Street. We had total confidence in Errigal’s ability and technical knowledge. In addition, we had confidence in Errigal’s in-depth knowledge of the products being used on the project which was important both to Vistry and to the client.

We also found everyone at Errigal excellent to work with and would certainly work with them in the future. There was a good flow of information and collaboration on the project which helped us work past any issues which came along. Inevitably when we moved on site there were a couple of ‘curve balls’ but we were pleased with Errigal’s ability to efficiently overcome them with solid technical solutions. Their understanding of the products on the market and their ability to put them forward as solutions meant we could continue without an impact on the programme.

We were also impressed by Errigal’s ability to carry out

The team from Errigal were very knowledgeable, demonstrating their experience and professionalism throughout the job. In addition, they were all very friendly and easy to work with which was a bonus on such a tight site which was surrounded by hotels, retail units and city- centre accommodation. Due to the geography of the site, safety was a critical consideration. Errigal supported us with

planning around issues such as access and temporary works. There was a one-team approach from everyone on-site, which was welcome and something you don’t always get. From a technical, quality assurance and safety point of view we couldn’t fault Errigal. They were accurate and honest with their programme timescales and planned around the pandemic to keep the works moving. The Health & Safety Executive and Fire Officer visited the site, and were

satisfied with the safe planning and execution of the works. Errigal also thoroughly tested and verified the cladding system on this complex project with trials conducted at third party facilities. We now view Errigal Contracts as a key member of our supply chain.

thorough testing on the products at a facility in Dubai. When you consider the logistics which goes into getting everything shipped out to Dubai, not every company would be keen to take this on. The fact that Errigal takes that further step is why we consider them a trusted member of our supply chain.

AndyWard OPERATIONS DIRECTOR

Michael Hodson TECHNICAL DIRECTOR

12

13

Made with FlippingBook Learn more on our blog