56th Street Infrastructure Assessment

Recommended Actions Based on the infrastructure assessment and an overlay of all measures, improvements and the highest areas of need are identified. The following locations are recommended focus areas to improve existing critical infrastructure based on the current conditions. The improvements are recommended to serve community amenities and encourage redevelopment of competitive sites, redevelopment sites, and existing industrial and vacant properties.

Transportation Improvements

Utility Improvements

Vulnerability Improvements

• Clifton Street to Hanna Avenue – Complete street improvements including dedicated pedestrian facilities (pg. 33-34) • Clifton Street to Sligh Avenue – Pavement repair (preventative treatment) (pg. 24-26) • 50th Street to Harney Road – Complete street improvements including shared use path (pg. 33-34), and major pavement rehabilitation (pg. 24-26) • Pine Grove Road to Orient Road – Major pavement rehabilitation (pg. 24-26) • Hillsborough Avenue to Sligh Avenue – Complete street improvements including speed reduction and shared use path (pg. 33-34), intersection safety improvements (pg. 31-32), and pavement repair (preventative treatment (pg. 24-26)) • Hillsborough Avenue to Sligh Avenue – Complete street improvements including speed reduction and dedicated pedestrian and bike facility (pg. 33-34), and intersection improvements at Hillsborough Avenue (pg. 31-32) • Hanna Avenue to Sligh Avenue – Pavement repair (preventative treatment) (pg. 24-26)

• Clifton Street to Sligh Avenue – Sewer system extension (septic to sewer conversion) (pg. 40-42)

• Diana Street to Pocahontas Avenue – Roadway flood exposure improvements (pg. 47- 51)

50th Street

• 50th Street to Harney Road – Sewer system extension (septic to sewer conversion) (pg. 40- 42)

• 54th Street to Tampa Truck Entrance – Roadway flood exposure improvements (pg. 47- 51)

Hanna Avenue

• East Lake Square Station 32 – Area flood exposure improvements (pg. 47-51)

Harney Road

• Park E Boulevard to Tampa Bay Technical Entrance – Roadway flood exposure improvements (pg. 47-51)

• Hillsborough Avenue to Sligh Avenue – Water system extension (pg. 40-42)

Orient Road

Section 5