North Airport Infrastructure Assessment

Recommended Actions Based on the infrastructure assessment and an overlay of all measures, improvements and the highest areas of need are identified. The following locations are recommended focus areas to improve existing critical infrastructure based on the current conditions. The improvements are recommended to serve community amenities and encourage redevelopment of competitive sites, redevelopment sites, and existing industrial and vacant properties.

Vulnerability Improvements

Transportation Improvements Utility Improvements

• Comanche #1 and Tampa West Pump Stations – Area flood exposure improvements (pg. 44) • Corporate Lake Drive to Tampa W Boulevard, and Hoover Boulevard to Hillsborough Avenue – Roadway flood exposure improvements (pg. 45-49) • Benjamin Pump Station – Area flood exposure improvements (pg. 44) • Ann Ballard Road to Hillsborough Avenue – Roadway flood exposure improvements (pg. 45-49) • Hangar Court to Knox Street – Roadway flood exposure improvements (pg. 45-49)

• Linebaugh Avenue to Sligh Avenue – Complete street improvements including speed reduction and shared-use path (pg. 30-31), intersection safety improvements at Sligh Avenue (pg. 28-29), and pavement repair (preventative treatment) (pg. 22-23) Hillsborough Avenue – Complete street improvements including capacity improvements and shared use path (pg. 30-31) • Hillsborough Avenue to Sligh Avenue – Complete street improvements including speed reduction and shared use path (pg. 30-31), pavement repair (preventative treatment) (pg. 22-23) • Veterans Expressway to Mullis City Way – Complete street improvements including speed reduction and shared use path (pg. 30-31), intersection safety improvements at Anderson Road (pg. 28-29), and pavement repair (preventative treatment) (pg. 22-23) • Waters Avenue to

• Waters Avenue to

Hillsborough Avenue – Sewer system extension (septic to sewer conversion) (pg. 36-38)

Anderson Road Area

• Waters Avenue to Johns Road – Sewer system extension (septic to sewer conversion) (pg. 36-38)

Benjamin Road Area

• Hanna Avenue to

Anderson Road – Water system extension (pg. 36-38)

Hoover Road Area

• Plantation Boulevard to Mullis City Way –

Linebaugh Avenue Area

Roadway flood exposure improvements (pg. 45-49)

• Crestwood Elementary – Area flood exposure improvements (pg. 44) • Waters Avenue to Broad Street – Roadway flood exposure improvements (pg. 45-49)

• Waters Avenue to Broad Street – Complete street

improvements including speed reduction and dedicated pedestrian and bike facilities (pg. 30-31)

Manhattan Avenue Area

Section 5

53

Made with FlippingBook Learn more on our blog