Palm River Infrastructure Assessment

Transportation Infrastructure Assessment Findings

The Transportation Assessment included a review of the existing roadway conditions along Hillsborough County maintained roadways and state facilities based on available data. The review of congestion, mobility, and safety conditions included data for volume to capacity ratios, travel time index, Context Classifications, pavement conditions, existing truck routes, existing HART routes, and crash patterns. Based on a review of the existing volume to capacity ratios and Context Classification considerations, the following roadways are recommended for complete street and safety improvements that could include speed reduction, improved facilities for all modes, and congestion reduction measures: • Falkenburg Road from Progress Boulevard to Selmon Expressway • Hartford Street from US 41 to 70th Street • Madison Avenue from US 41 to 78th Street • 36th Avenue from US 41 to 78th Street • 70th Street from Causeway Boulevard to end • 78th Street from Causeway Boulevard to Madison Avenue • S Falkenberg Road & Causeway Boulevard

Intersection safety improvements are recommended at the following intersections based on a pattern of crash types. Improvements should take into consideration access management strategies, lane geometry, existing pedestrian and bike facilities, and sight distance, following a detailed safety analysis at the intersection locations.

• S 78th Street & Causeway Boulevard • Progress Boulevard & S 78th Street • Madison Avenue & US 41 • Madison Avenue & 66th Street • US 301 & Causeway Boulevard • S Falkenberg Road & Causeway Boulevard

Based on the pavement condition index of County maintained roadways in the study area, the following roadways have poor to very poor pavement condition and are recommended to be considered for major rehabilitation: • Hartford Street from railroad to South 54th Street • 54th Street from Causeway Boulevard to St Paul Street • 66th Street south of Madison Avenue • Santa Fe Road west of railroad The following roadways are identified as serious to failed conditions and are recommended to be considered for reconstruction: • Port Sutton Road west of railroad • Trenton Street west of 51st Street • Towaway Avenue from US 41 South to Sagasta Street

To further identify the project scopes for the transportation improvements, identifying the required funding sources, public engagement, and coordination with partner agencies including the City of Tampa and Florida Department of Transportation, should be completed.

36 Palm River Redevelopment Area Infrastructure Assessment Hillsborough County