Palm River Infrastructure Assessment

Septic Tanks According to the Florida Water Management Inventory – Hillsborough County Wastewater Map, the redevelopment area has a mix of sewer and septic systems. Primarily in the western half of the area, wastewater is treated by onsite septic systems. Existing County GIS data has a total of 246 septic systems within the study area and the locations of the septic tanks are shown on Figure 17 . The 2018 Hazen and Sawyer Hillsborough County Septic Tank Conversion – Neighborhood Prioritization Report, the Palm River redevelopment study area falls within group D of potential septic to sewer conversion. In this report, parcels that already had wastewater service were removed from the study and only parcels that were single family residential were labeled as a priority for conversion. The County has an estimated total of $17.3M for septic to sewer improvements in an area north of Causeway Boulevard but does not include the Palm River redevelopment area at this time. Based on this assessment of wastewater infrastructure, a location with existing single family residential and septic systems between 54th Street and 84th Street may be a candidate for septic to sewer conversion.

43 Section 3

Made with FlippingBook Learn more on our blog