Palm River Infrastructure Assessment

Recommended Actions

Based on the infrastructure assessment and an overlay of all measures, improvements and the highest areas of need are identified. The following locations are recommended focus areas to improve existing critical infrastructure based on the current conditions. The improvements are recommended to serve community amenities and encourage redevelopment of competitive sites, redevelopment sites, and existing industrial and vacant properties.

Transportation Improvements

Utility Improvements

Vulnerability Improvements

• 78th Street, US 301 and Falkenburg Road – Intersection safety improvements (pg. 32-33) • Progress Boulevard to Selmon Expressway – Complete street improvements including speed reduction and shared-use path (pg. 34-35) • Fallen Leaf Drive to Bellewater Boulevard and US 301 to Crescent Park Drive – Pavement repair (preventative treatment) (pg. 24-26) • US 41 to 70th Street – Complete street improvements including a shared use path (pg. 34-35) • Railroad crossing to 54th Street – Major pavement rehabilitation (pg. 24-26) • US 41 to 78th Street – Complete street improvements including speed reduction and a shared use path (pg. 34-35) and intersection safety improvements at US 41 (pg. 32-33) • US 41 to 78th Street – Complete street improvements including sidewalks and shared lane (pg. 34-35)

Causeway Boulevard Area*

• Frost Elementary and Guinta Middle School – Area flood exposure improvements (pg. 52) • S ienna Moss Pump Station

Falkenburg Road Area

– Area flood exposure improvements (pg. 51)

• US 41 to 70th Street – Roadway flood exposure improvements, high criticality (pg. 53-65) • Hartford Lake Pump Station – Area flood exposure improvements (pg. 51) • US 41 to 78th Street – Roadway flood exposure improvements, high criticality (pg. 53-65) • Bing Elementary – Area flood exposure improvements • US 41 to 78th Street – Roadway flood exposure improvements, high criticality (pg. 53-65)

• US 41 to 70th Street – Sewer system extension (septic to sewer conversion) (pg. 42-43)

Hartford Street Area

Madison Avenue Area*

• US 41 to 78th Street – Sewer system extension (septic to sewer conversion), water system extension (pg. 42-43)

36th Avenue Area

* Evacuation Route

Section 5

69

Made with FlippingBook Learn more on our blog