Palm River Infrastructure Assessment

Improvement Benefit

Ongoing Project or Planned Improvement

Location

Recommended Improvement

36th Avenue Area 36th Avenue from US 41 to 78th Street

Sidewalks and shared lane markings

/ /

36th Avenue from US 41 to 78th Street

Flood exposure improvements

/ /

Sewer collection/transmission system extension (septic to sewer conversion)

36th Avenue from US 41 to 78th Street

/

36th Avenue from US 41 to 78th Street

Water transmission extension

/

36th Avenue from 54th Street to 78th Street

Pavement repair - preventative treatment

/

36th Avenue from US 41 to railroad

Pavement repair - preventative treatment

/

Bing Elementary

Flood exposure improvements

/ /

70th Avenue Area 70th Street from Causeway Boulevard to end

Sidewalks and shared lane markings

/ /

70th Street from Causeway Boulevard to end

Flood exposure improvements

/ /

Sewer collection/transmission system extension (septic to sewer conversion)

70th Street from Causeway Boulevard to end

/

70th Street from Causeway Boulevard to end

Water transmission extension

/

70th Street south of Chattin Road

Pavement repair - preventative treatment

/

70th Street from Causeway Boulevard to 36th Avenue

Pavement repair - preventative treatment

/

78 Palm River Redevelopment Area Infrastructure Assessment Hillsborough County A-

Made with FlippingBook Learn more on our blog