ENGLISH
10.0 DATUMS You may datum as part or your test. The primary datum is referred to as Datum #0. A second datum (available only during a test) is referred to as Datum #1. The Datum step sets a datum according to the position and load at the moment the Datum step is executed during a test. The distance and/or load may be preset to display a zero or non-zero value at the time. You may use a second datum for load or position during a test for more complex applications. For example, Datum #1 may be used to determine the distance that corresponds to a creep rate. • Pull to a load. • Datum (set the datum to Datum #1) and zero the distance. • Hold for 10 minutes. The distance reported at the end of the Hold step is creep over 10 minutes.
11.0 ASK STEPS An Ask step can be used to create a question for the operator to answer during a test, or to display a prompt for the user.
The TELL step is used to communicate information to the operator. No response is required.
The Preset Load lets you specify the load value that must be met inorder to establish the datum.
The ASK step requires a response to the prompt. Responses must be less than 8 character answers.
The Preset Distance lets you specify the distance value that must be met inorder to establish the datum.
Specify the Datum type as either "0" or "1".
PKG08819-UML2SOFT 25
Made with FlippingBook - professional solution for displaying marketing and sales documents online