District Park
Charles Forest
N
45
House Park
47
46
38
State of Texas Capitol
31 courthouse, called the Linden after West 17th Street’s original name. The high-rise will have approximately 117 condos, ranging in size from one-bedroom units to a limited number of two-story penthouses, as well as ground-floor retail. Mexic-Arte Museum Planned Mexic-Arte is developing plans for a new 7-story (two underground) building replacing the current building on the southeast corner of Congress Avenue and E. 5th St. 48 The first phase of the Capitol Complex development includes the construction of an approximately 602,000 sq.ft., 14-story new Gateway “Focus” building located at MLK Blvd. and Congress Avenue with a cultural venue, plaza amphitheater, five stories of below grade parking, wellness space amenities, and 400,000 square feet of administrative office space. Scheduled completion is in May 2022. Hilton Garden Inn Under Construction HRI has submitted plans for a 204-room hotel. The 18-story building would have 126,029 sq.ft. of hotel space, with an additional 1,900 sq.ft. of restaurant space on the ground floor. Expected completion is September 2021. The Linden Planned Reger Holdings LLC is planning its first Austin high-rise, a 28-story condo tower for the north side of downtown across from the new Travis County 46 47 Convention Center Expansion Planned In March 2019, Austin City Council unanimously approved a $1.2 billion plan to expand the Austin Convention Center. A plan is now in place to open negotiations to purchase Block 16 and 32, bordered by E 2nd Street, San Jacinto Blvd, E 4th Street, and Trinity St. Dorsey Under Construction Known until recently as “The Huston,” by its developer LMC (a Lennar company), the Dorsey will be a 15-story multifamily development with parking. The 2.09-acre site off east I-35 between 11th and 12th Streets will have 372 multifamily residential units and 22 live-work units. Block 87 Proposed Cielo Property Group proposed a 31-story mixed use tower at this location, but has instead decided to list the property for sale. Currently a parking lot, it is one of the last undeveloped blocks downtown, and interest in the property will be high. George HW Bush Under Construction State Office Building 42 43 44 45
AMTRAK STATION subterranean floors of garage, a lobby floor, three floors of parking above the lobby, then a fifth floor with roughly 21,000 sq.ft. of office space. After that, it’s an average 16,500 sq.ft. of residential units per floor as the tower component rises. Expected completion in July 2021. The Avenue Hotel Under Construction The tallest downtown tower north of the Texas State Capitol is planned at 400 West 14th Street. Cypress Real Estate Advisors is planning a 31-story tower with 239,710 sq.ft. of office, 3,614 sq.ft. of ground floor retail, and 584 parking spaces in its podium. 1601 Congress Under Construction State Office Building The second phase of the Capitol Complex development includes the construction of an approximately 430,000 gross square feet, 12-story “Fabric” building for the Capitol Complex located along North Congress between 16th and 17th Streets. It includes a conference center with multiple room sizes and accommodations for configurable meeting space, five stories of below-grade parking, wellness space amenities, and 200,000 sq.ft. of “useable” administrative office space. Scheduled completion is in Spring 2022. Alexan Capitol Under Construction 5th & Brazos Under Construction This is a 32-story skyscraper with two hotels and residences at East 5th and Brazos Street. The tower will include 411 hotel rooms, 330 apartments, and 8,000 sq.ft. of retail, including a restaurant, cocktail lounge, and meeting space. Chicago-based Magellan Development Group is the developer. Estimated completion Q1 2021 400 West 14th Planned 36 37 With 30 floors, Alexan Capitol will be the tallest tower in the Trammel Crow Alexan brand’s Texas portfolio so far. The building’s podium includes three A vacant retail space on Congress Avenue in downtown Austin will be replaced with a 31-story Hyatt Centric boutique hotel with 246 rooms. Nelsen Partners is the architect and Katera is the general contractor. Expected completion Fall 2021. Central Health Under Construction Brackenridge Campus Redevelopment Central Health, Travis County's publicly funded health care district, is working with community partners and experts on the future reuse and redevelopment of its Brackenridge Campus. A 17-story tower is planned on the site of the Brackenridge Hospital. Slated for completion in 2022. 41 38 39 40
49
Under Construction
37
Duncan Park celebrates the Capitol and centralizes all state agencies. Characterized by grand civic spaces, shaded pedestrian friendly streets, and connections to the surrounding community, the first phase of the master plan includes two new office buildings and five levels of underground parking, which will be the base of a new, pedestrian-oriented Texas Mall. This tree-lined promenade will be located on Congress Avenue between 16th Street and Martin Luther King Jr. Boulevard, and will serve as the northern gateway to the Capitol Complex with public green space for tourism, events, and festivals. Symphony Square Planned Complex Master Plan The 2016 Texas Capitol Complex Master Plan reimagines the Capitol Complex as a destination that 41 TBA plans to use 10,000 square feet for its own employees and lease out the rest. TBA hopes construction will begin in 2021. UT Office Tower 21 Greystar is planning a 31-story mixed-use tower surrounding the historic Symphony Square at Red River and 11th streets. The project will have 129,000 sq.ft. of office space, ground floor retail, and 385 residential units, including 465 sq.ft. “micro-units”. 7H[DV%DQNHU·V$VVRFLDWLRQ Proposed TBA plans to demolish its existing HQ building at 203 W. 10th St near the Capitol and build a nine-story office tower in its place. The building is planned with about 100,000 square feet of leasable space, and 15 can accommodate up to 5,000 people, made possible by a $15 million grant from the Moody Foundation. In addition, Waterloo Park will feature a great lawn, a variety of gardens, an elevated 19 promenade, water features, meditative spaces, and children's play spaces. The park is expected to open to the public in spring 2021. Waterloo Park Tower Planned Hesperus Group LLC is now the developer for a hotel at 38 Planned A new 17-story office building will anchor the ongoing Brackenridge redevelopment in downtown Austin, housing some of The University of Texas Dell Medical School operations and future strategic partners. Waterloo Park Under Construction A dramatic makeover of Waterloo Park is underway after work began in Sept. 2017. Improvements to the park will include the addition of an amphitheater that 52 53 1201 Red River St. Current plans call for a 24-story structure with 256 rooms, near the nearly complete Waterloo Park redevelopment and Dell Seton Medical Center. 50 51 54
Frank Erwin Center
West Austin Park
49
41
53
52
Medical Center at Breckenridge
54
50
51
39
43
40
44
36
48
MetroRail
42
Made with FlippingBook - Online catalogs