EV Battery Facilities The Ardmac Way

NISSAN CASE STUDY

Air loss through conveyor openings was overcome by the introduction of rapid roller doors which interfaced with the conveyor to open and close for the minimum time to allow product to pads through the wall.

Project: Nissan, Sunderland, UK The UK’s first Battery Car Manufacturing facility

Ardmac installed over 10,000m2 of sandwich panel. Architectural Scope included Partitions and ceilings (some Fire Rated) Doors (various types), windows, Interlocks, Fire stopping, handrails and accessories along with process equipment enclosures. Ardmac Installed the architectural fabric to maintain the controlled environment very Low humidity areas necessitated the panelling system to act as a vapour barrier.