Transmission Additions As of August, 2020, there are approximately 124,000 miles of transmission lines operated at 100 kV and above in the SERC Region. Entities within the SERC Region anticipate adding approximately 2,500 miles during the 10-year reporting period. SERC entities coordinate transmission expansion plans in the Region annually through joint model-building efforts that include the plans of all SERC entities. The coordination of transmission expansion plans with entities outside the Region is achieved through annual participation in joint modeling efforts with the Eastern Interconnection Reliability Assessment Group (ERAG) Multi-regional Modeling Working Group (MMWG). Transmission expansion plans by most SERC entities are dependent on regulatory support at the federal, state, and local levels since the regulatory entities can influence the siting, permitting, and cost recovery of new transmission facilities.

Figure 5: Bulk Electric System Transmission Mileage by Operating Voltage Class

Made with FlippingBook - Online magazine maker