2020 RRS Annual Assessment

This 2020 Reliability Review Subcommittee Annual Assessment (2020 Annual Report) was developed by the SERC Reliability Review Subcommittee (RRS). This assessment was developed based on data and narrative information collected by SERC from its Registered Entities to independently assess the long-term reliability of the SERC BPS while identifying trends, emerging issues, and potential risks during the ten-year assessment period. The Reliability Review Subcommittee (RRS), at the direction of SERC’s Engineering Committee, supported the development of this assessment through a review process that leveraged the knowledge and experience of system planners, RRS members, SERC staff, and other subject matter experts. This review process ensures the accuracy and completeness of all data and information. The SERC Engineering Committee reviewed and approved this assessment.


Preface
3

About This Assessment
4

Executive Summary
5

Key Findings
5

Expected demand projections for the SERC Region are almost flat.
5

Five of the seven SERC subregions expect the Anticipated Reserve Margins to be above twenty percent for the ten-year period.
5

Only slight changes in the Regional resource mix are projected for the 10-year planning horizon, with no significant change reported from 2019 to 2020. The only exception is higher long term forecasted growth in variable energy resources
5

SERC is proactively addressing the impacts of increased renewable resources within the SERC footprint and identifying its risks through various forums.
5

Across the SERC Region, member companies continue to build transmission, especially in the first five years of the assessment period, to ensure a reliable interconnected power system.
6

Subregion Reserve Margins
7

Capacity Resource Trends
8

Capacity Resource Topics
9

Demand Projections
10

Figure 4: SERC Region Total Internal Demand (MW)
10

Transmission Additions
11

SERC Central
14

Highlights
14

State of Reliability of SERC Central
15

SERC East
16

Highlights
16

State of Reliability of SERC East
17

SERC FL-Peninsula
18

Highlights
18

State of Reliability of SERC Florida Peninsula
19

SERC MISO-Central
20

Highlights
20

State of Reliability of SERC MISO-Central
21

Reported demand-side management response in the SERC MISO-Central subregion exceeds 1,000 MW, or 5.4 percent of the Total Internal Demand for 2020. This level of demand response is expected to continue through the forecast period.
21

SERC MISO-South
23

Highlights
23

State of Reliability of SERC MISO-South
24

SERC PJM
25

Highlights
25

State of Reliability of SERC PJM
26

As with many of the SERC subregions, Distributed Energy Resources (DERs) are accounted for in the load forecast. For the purposes of the long-term load forecast, PJM defines distributed solar generation as any solar resource that is not interconnected...
26

SERC Southeast
27

Highlights
27

State of Reliability of SERC Southeast
28

Working Group Contributions
30

Variable Energy Resources
30

Scope of Activities
30

Work accomplishments
30

VERWG Assessment
30

The SERC Region is moving in a direction that allows all SERC entities to have increased certainty and understanding on the effects of VERs on the Bulk Electric System as usage increases. SERC and its members are focused on identifying risk caused by ...
30

Reliability Risk
31

Near/Long-Term Transmission Summary
32

Seasonal Outlook
33

Load Forecast
35

Resource Categories
36

Reserve Margin
37

Appendix A SERC Membership
39

www.serc1.org