E BOWIE ST
---
1 2 1 2 1
1 6
1 1
3
BAKER ST
5 2 3 1
14
E LOWDEN ST
---
--- --- --- ---
3 6 2 0
GLEN GARDEN DR
1
E CANTEY ST
--- ---
JUDD ST
---
---
E MORNINGSIDE DR
9
1
3
1
14 94
TOTAL
32
12
26
24
Table 21 : Evans Avenue Top 5 Contributing Factors
Number of crashes
Contributing Factors
Driver Inattention
27 13 13 11
Failed To Yield Right Of Way – Turning Left
Failed To Control Speed
None
Disregard Stop And Go Signal
9
Table 22 : Evans Avenue KSI Crashes Summary Intersection Intersection Type
Collision Manner
Contributing Factor
Same Direction; Both Going Straight-Rear End Angle; Both Going Straight (fatality)
Had Been Drinking; Driver Inattention
E BERRY ST
Signalized
BAKER ST
Side Stop-Controlled
Disregard Stop And Go Signal
Field Observations and Recommendations In November 2024, project team members conducted field observations of the corridor to better understand the existing operations and challenges . These observations are grouped into two categories: corridor- focused and intersection -focused. Corridor - Focused Recommendations The following field observations were made along Evans Avenue. These observations pertain to the entirety of the corridor and are not segment - specific, unless otherwise noted.
31
Made with FlippingBook - Share PDF online