2025-08-29_Ft Worth Safety Action Plan_FINAL_Compressed Com…

Table 33 : Evans Avenue Corridor – Final Cost - Benefit Ratio Benefit Results Cost Results

Final Benefit / Cost Ratio

$ 18,840,000

$3,401,300

5.54

Table 34 : Cost Results for Evans Avenue Corridor

Annual Maintenance Cost

Service Life

Construction Cost

Improvement Type

Cost (Each)

Quantity

Install/refresh high -visibility crosswalks

$16.00/LF

1,485

4

$23,760.00

$5,940.00

Install Stop Bar Install Bike Lanes Curb extension

$30.00

26

4 4

$780.00

$195.00

$541.00/50 LF

130

$132,545.00 $80,000.00

-

$10,000.00

8

25

$33,136.25

Reconfigure ramps to meet ADA Standard Install additional lighting Install continuous sidewalks

$3,500.00

28

25

$182,000.00

-

$5,331.30 $134.86/LF

1

15 10

$5,331.30

-

5,385

$726,245.43

$366.57

Install pedestrian push button

$447.50

4

10

$1,790.00

$72,624.54

Total

$1,152,451.73 $112,441.36 Lifecycle Cost (20 years) $3,401,300

Table 35: Benefit Results for Evans Avenue Corridor

Prevention Benefit* $3,700,000 $3,700,000

# of Crashes Prevented

Crash Severity

Total Benefit

K - Fatal

1 1

$3,700,000 $3,700,000

A – Severe Injury

B – Non- Incapacitating or Suspected Minor Injury

$520,000

22

$11,440,000

Total Benefit: $18,840,000

41

Made with FlippingBook - Share PDF online