Table 33 : Evans Avenue Corridor – Final Cost - Benefit Ratio Benefit Results Cost Results
Final Benefit / Cost Ratio
$ 18,840,000
$3,401,300
5.54
Table 34 : Cost Results for Evans Avenue Corridor
Annual Maintenance Cost
Service Life
Construction Cost
Improvement Type
Cost (Each)
Quantity
Install/refresh high -visibility crosswalks
$16.00/LF
1,485
4
$23,760.00
$5,940.00
Install Stop Bar Install Bike Lanes Curb extension
$30.00
26
4 4
$780.00
$195.00
$541.00/50 LF
130
$132,545.00 $80,000.00
-
$10,000.00
8
25
$33,136.25
Reconfigure ramps to meet ADA Standard Install additional lighting Install continuous sidewalks
$3,500.00
28
25
$182,000.00
-
$5,331.30 $134.86/LF
1
15 10
$5,331.30
-
5,385
$726,245.43
$366.57
Install pedestrian push button
$447.50
4
10
$1,790.00
$72,624.54
Total
$1,152,451.73 $112,441.36 Lifecycle Cost (20 years) $3,401,300
Table 35: Benefit Results for Evans Avenue Corridor
Prevention Benefit* $3,700,000 $3,700,000
# of Crashes Prevented
Crash Severity
Total Benefit
K - Fatal
1 1
$3,700,000 $3,700,000
A – Severe Injury
B – Non- Incapacitating or Suspected Minor Injury
$520,000
22
$11,440,000
Total Benefit: $18,840,000
41
Made with FlippingBook - Share PDF online