Table 73: Recommended countermeasures for NW 26th Street corridor

Estimated CMF

Estimated Cost

Time f rame

Location

Recommendation

Intersection

Install/refresh high-visibility crosswalks

0.6

$21,760.00

Short (1 - 3 years)

Intersection

Install advance signal, stop or yield signs

0.75

$2,000.00

Intersection Intersection

Install Stop Bar

-- --

$750.00

Relocate Fire Hydrant and Mast Arm Install median pedestrian refuge

$25,000.00

Intersection Intersection Intersection

0.44

$4,100.00

Medium (3 -5 years)

Curb extension

-- --

$100,000.00

Reconfigure ramps to meet ADA Standard Install additional lighting Install continuous sidewalks

$87,500.00

Segment Segment

0.58 0.35

$93,297.75

$335,138.33 $669,546.08

Benefit -Cost Analysis The estimated cost - benefit result for NW 26 th Street is 6.69 (Table 74). Table 75 summarizes the estimated improvement costs by type and Table 76 summarizes the benefits (dollars) resulting from the implementation of the proposed safety countermeasures.

Table 74: NW 26th Street Corridor – Final Cost- Benefit Ratio Benefits Costs

Final Benefit / Cost Ratio

$10,400,000

$1,553,700

6.69

Table 75: Cost Results for NW 26th Street Corridor

Annual Maintenance Cost

Service Life

Construction Cost

Improvement Type

Cost (Each)

Quantity

Install/refresh high- visibility crosswalks

$16

1360

4

$21,760.00

$5,440.00

Install advance signal, stop or yield signs

$100

20

6

$2,000.00

$300.00

73