2025-08-29_Ft Worth Safety Action Plan_FINAL_Compressed Com…

(3 -5 years)

Intersection

Modify curb geometrics Install buffered bike lanes

--

$100,000.00 $57,225.09 $128,121.29

Segment Segment

0.47 0.35

Install sidewalks

Install median pedestrian refuge islands Reconfigure curb ramps to meet ADA Standard

Intersection

0.68

$28,700.00

Intersection

0.65

$77,000.00

Total: $456,524.39

Benefit -Cost Analysis The estimated cost - benefit result for S Beach Street is 17.04 (Table 111 ). Table 112 summarizes the estimated improvement costs by type and Table 113 summarizes the benefits (dollars) resulting from the implementation of the proposed safety countermeasures.

Table 111: S Beach Street Corridor – Final Cost- Benefit Ratio Benefits Costs

Final Benefit / Cost Ratio

$20,060,000

$1,177,100

17.04

Table 112: Cost Results for S Beach Street Corridor

Annual Maintenance Cost

Service Life

Construction Cost

Improvement Type

Cost (Each)

Quantity

Install Rectangular Rapid Flashing Beacon Consolidate access points

$15,011

2.00

10

$30,022.00

$4,302.20

$6,720 $10,000 $270,500 $134.86

3.00

25 25

$20,160.00 $100,000.00 $57,225.09

- -

Curb extension

10.00

Install buffered bike lanes Install continuous sidewalks Install median pedestrian refuge Install dynamic speed feedback signage

0.21

4

$14,306.27

950.00

10 25

$128,121.29 $12,812.13

$4,100

7.00

$28,700.00

-

$200

2.00

10

$400.00

$600.00

Install Stop Bar

$30

8.00

4

$240.00

$60.00

108

Made with FlippingBook - Share PDF online