2025-08-29_Ft Worth Safety Action Plan_FINAL_Compressed Com…

Table 122: Sharondale Street Corridor – Final Cost - Benefit Ratio Benefits Costs

Final Benefit / Cost Ratio

$16,880,000

$764,900

22.07

Table 123 : Cost Results for Sharondale Street Corridor

Annual Maintenance Cost

Service Life

Construction Cost $140,000.0 0 $194,737.8 4

Improvement Type

Cost (Each)

Quantity

Curb extension

$10,000

14

25

-

Install continuous sidewalks Install Stop Bar

$134.86 / LF

1444 LF

10

$19,473.78

$30

6

4

$180.00

$45.00

Install/refresh high - visibility crosswalks Reconfigure ramps to meet ADA Standard

$16 / LF

120 LF

4

$1,920.00

$480.00

$3,500

8

25

$28,000.00 -

Total

$364.837.8 4

$19,998.78

Lifecycle Cost (20 years) $3,558,400

Table 124 : Benefit Results for Sharondale Street Corridor

Prevention Benefit 1 * $3,700,000 $3,700,000

# of Crashes Prevented

Crash Severity

Total Benefit

K - Fatal

0 4

$0

A – Severe Injury

$14,800,000

B – Non- Incapacitating or Suspected Minor Injury

$520,000

4

$2,080,000

Total Benefit : $16,880,000

1 Cost obtained from TxDOT 2021 SII Calculator

117

Made with FlippingBook - Share PDF online