Recommendation : Install new high-visibility crosswalks. Mark new stop bars on side street approaches. Issue : Power pole in the middle of sidewalk/ramp on the southwest corner. Recommendation : R elocate power pole. Issue : Missing sidewalk on the north side of the intersection. Recommendation : Install sidewalk along the north side of Sycamore School Road.
Other Crossing Characteristics
Sidewalks
Railroad Crossing This is a gate - controlled railroad crossing. There are no sidewalks or ramps. There has been a KSI crash at this intersection.
Table 135 : Railroad crossing recommendations Category
Issues and Recommendations
Issue : No pedestrian crossing of train tracks. Recommendation : Continue sidewalk through level crossing. Include detectable warning surfaces per PROWAG.
Other Crossing Characteristics
Issue : Missing sidewalk on both sides. Recommendation : Install sidewalks.
Sidewalks
Hemphill Street This is a signalized intersection. There are curb ramps on all four corners. Hemphill Street is on Fort Worth’s bond project list as a Tier 2 bond project. This plan calls for conversion to a four - lane divided arterial. Care will need to be taken to improve safety at this intersection. There have been two KSI crashes at this intersection, one of which was fatal.