Install dynamic speed feedback signage Implement leading pedestrian intervals Install Stop Bar Install Pedestrian Crosswalk (High - Visibility) Consolidate access points Install Pedestrian Refuge Islands Install pedestrian signal heads | Install Pedestrian Pushbutton
Segment
0.95
$30,000.00
Intersection
0.87
$200.00
Intersection
--
$480.00
Intersection
0.90
$25,680.00
Segment
--
$20,160.00
Intersection
0.68
$4,100.00
Intersection
--
$17,360.00
Medium (3 -5 years)
Segment
Install Sidewalks
0.35
$1,424,843.64
Reconfigure Curb Ramps to meet ADA Standard
Intersection
0.65
$248,500.00
Total: $1,774,323.64
Benefit -Cost Analysis The estimated cost - benefit result for Sycamore School Road is 26.56 (Table 14 5). Table 146 summarizes the estimated improvement costs by type and Table 147 summarizes the benefits (dollars) resulting from the implementation of the proposed safety countermeasures.
Table 145 : Sycamore School Road Corridor – Final Cost - Benefit Ratio Benefits Costs
Final Benefit / Cost Ratio
$128,960,000
$4,854,600
26.56
Table 146 : Cost Results for Sycamore School Road Corridor
Annual Maintenance Cost
Service Life
Construction Cost
Improvement Type
Cost (Each)
Quantity
134