PRIORITIZING SPECIFIC PROJECTS Based on field observations and crash data analysis, both corridor- wide countermeasures and location-specific safety improvements were identified for each corridor. Countermeasures were selected primarily from FHWA’s Proven Safety Countermeasures Initiative (PSCi), categorized into five key areas: • Speed Management • Pedestrian/Bicyclist Safety • Roadway Departure • Intersections • Crosscutting Measures Additional countermeasures beyond PSCi were recommended where they could provide meaningful safety benefits based on the corridor’s crash profile. Each proposed countermeasure includes a suggested implementation timeframe to support project execution. BENEFIT COST ANALYSIS A benefit-cost analysis (BCA) compares the total benefits of recommended improvements to their overall cost over a specified period. The benefit- cost ratio is calculated using a 20-year horizon by estimating the monetized value of crashes prevented . Future crashes are projected assuming a stable crash rate with traffic growth, while a crash modification factor (CMF) adjusts for expected reductions with safety improvements. Project costs include initial expenses (construction, survey, and engineering) and ongoing maintenance over 20 years. Cost estimates, based on City bid tab data, are presented in 2025 dollars .
FUNCTIONAL CLASSIFICATION
BENEFIT COST RATIO
ID ROADWAY
FROM
TO
HIN MODE
1
Ellis Ave
NW 21st St
NW 28th St
Residential
Pedestrian, Motor Vehicle
16.29
2
Sharondale St
6th Ave
James Ave
Residential
Bicycle
22.07
3
NW 14th St
N Main St
Gould Ave
Residential
Pedestrian
48.08
4
S Beach St
Ave H
Mitchell Blvd
Major Arterial
Motor Vehicle
17.04
5
Evans Ave
E Morningside Dr
E Berry St
Major Arterial
Motor Vehicle
5.54
N Main St / Stockyards Blvd
Angle Ave / Refugio Ave
6
NW 26th St
Residential
Pedestrian
6.69
E Pennsylvania Ave / S Main St
7
Pennsylvania Ave
8th Ave
Minor Arterial
Pedestrian, Motor Vehicle
30.90
8
W Seminary Dr
6th Ave
Rector Ave
Major Arterial
Bicycle, Pedestrian
35.82
Motor vehicle, Commercial motor vehicle, Motorcycle
9
Mark Iv Pkwy
Meacham Blvd
Crossover Ramp
Major Arterial
18.26
Bicycle, Pedestrian, Motor vehicle
10
Sycamore School Rd South Fwy Sr Nb W Everman Pkwy
Minor Arterial
26.56