2025-08-29_Ft Worth Safety Action Plan_FINAL_Compressed Com…

SOUTH BEACH STREET FROM AVENUE H TO MITCHELL BOULEVARD (0.22 MILES)

CONTEXT

This is a major arterial with Sycamore Park and Polytechnic Senior High School located just north of the study area. The roadway has four to five lanes with a median between Avenue I and Mitchell Boulevard. Continuous sidewalks are present on both sides, and the corridor is designated as a commercial delivery route. Pavement width ranges from 62 to 83 feet, including the median, with a right-of-way of approximately 92 to 115 feet. The corridor is part of the Motor Vehicle High Injury Network (HIN).

TOTAL CRASHES (2019-2023) 66

7 FATAL & SEVERE INJURY CRASHES

FATAL & SEVERE CRASHES

TOTAL CRASHES

CRASH LOCATION

100% Motor Vehicle

Motorcycle 29%

Mid-block 15%

71% Motor Vehicle

Intersection 85%

KEY CRASH TYPES

KEY CONTRIBUTING FACTORS

Angle Crashes

Opposite Direction Crashes

Driver Inattention

Disregard Stop And Go Signal

| 54

Made with FlippingBook - Share PDF online