MARK IV PARKWAY FROM MEACHAM BOULEVARD TO CANTRELL SANSOM ROAD (1.61 MILES)
CONTEXT
This is a major arterial primarily lined with industrial uses, including distribution centers for USPS, FedEx Freight, DHL, and Amazon. The roadway consists of four to six lanes with a grass median featuring curb breaks at major driveways. The median varies in width, with mostly unmarked left turn lanes. Sidewalks are limited but present on both sides north of I-820. Pavement width ranges from 82 to 98 feet, with a right-of-way of approximately 120 to 124 feet. The corridor is part of the Motor Vehicle High Injury Network (HIN), Commercial Motor Vehicle HIN, and Motorcycle HIN.
TOTAL CRASHES (2019-2023) 208
6 FATAL & SEVERE INJURY CRASHES
FATAL & SEVERE CRASHES
TOTAL CRASHES
CRASH LOCATION
Mid-block 19%
Pedestrian 17%
100% Motor Vehicle
17% Motor Vehicle
Intersection 81%
67% Motorcycle
KEY CRASH TYPES
KEY CONTRIBUTING FACTORS
Opposite Direction Crashes
Failed To Yield Right of Way – Turning Left
Same Direction Crashes
Driver Inattention
| 64
Made with FlippingBook - Share PDF online