GSW CONSTRUCTION, INC. JET FUEL PIPING & MECHANICAL
A HEAVY CIVIL CONTRACTOR PROVIDING SERVICES IN THE GREATER BAY AREA
www.gswconstruction.com
GSW CONSTRUCTION, INC. Safety is our #1 priority!
Weekly Safety Tailgates LOTO Awareness/Machine Guarding Respiratory Fit-test CPR Training Ladder Safety/Fall Prevention Driver Safety Substance Abuse Awareness for Managers Heat Illness Prevention Program Fire Prevention Training Supervisory Training on Fire Prevention & Excavation
HAZCOM/GHS & Chemical Control Workplace Violence Prevention Plan
Wildfire Smoke Protection Confined Space Training Trenching & Excavation Safety IIPP Employee Responsibilities & Incident Reporting Personal Protective Gear Confined Space Rescue Training
www.gswconstruction.com
GSW CONSTRUCTION, INC.
GSW CONSTRUCTION, INC. IS A LICENSED HEAVY CIVIL CONTRACTOR LOCATED IN SAN FRANCISCO, CALIFORNIA
Founded in March of 2021, GSW serves public utility agencies, private utility agencies, as well as general contractors throughout the greater San Francisco Bay Area. GSW was founded by experienced heavy civil construction professionals, with a collective experience of over 40 years. GSW specializes in small to large construction projects in the public and private sector. GSW’s construction expertise ranges from mass excavations, structural concrete, wet and dry utilities, large diameter welded steel pipe, water and wastewater facilities, aviation fuel line installation and distribution.
101 The Embarcadero Suite #123, San Francisco, CA | www.gswconstruction.com
22-017
HEAVY INDUSTRIAL MECHANICAL PIPING
www.gswconstruction.com
B31.3 Process Piping Valve Replacement Mechanical Equipment Install Tank Farm Modifications and Repairs
www.gswconstruction.com
23-005
MOFFETT FIELD USGS RESEARCH FACILITY HENSEL PHELPS
www.gswconstruction.com
FUEL LINE ABONDONMENT
Mobilization 1 – sampling & analysis
Extract and contain sample of pipe contents to be ready for testing Testing Haul facilities
Mobilization 2 - Pipe remediation
Excavate existing Jet A Fuel line. Extract and off-haul all pipe Waste manifests prior to off-haul Cut, remove, and dispose of riser section Pump line remaining on site full of slurry
Safely abandon an existing fuel line with Cementous Slurry and remove residual product in pipeline
www.gswconstruction.com
23-010
SFO JET FUEL HYDRANT SYSTEM TRANSFER LINE REPAIRS
BURNS & MCDONNELL
www.gswconstruction.com
Transfer Line and Hydrant System Repairs
Install rumble plates, linear controls, stabilized construction entrance with tire wash stormwater related Best Management Practices (BMPs) (e.g. straw wattle, silt fencing) as needed at the various work locations. Daily closeout of the Work, including any potential transport or hauling of soil, will require sweeping and cleaning to an acceptable level by the SFO Airfield Operations staff. This project consists of extension (to grade) of one low point drain (NLP-6) and a high point vent (OHP- 6), decommissioning one fuel vault (FV-14), and installation of a high point vent riser into an existing isolation valve pit (BAB-IVP-50-3). This includes installation of pit components, associated equipment, hydrostatic pit testing, and application of protective coatings. Confirmation soil samples are to be analyzed for TPHd using Environmental Protection Agency (EPA) Method 8015M with silica gel cleanup method 3630C.
www.gswconstruction.com
CORE VALUES FAMILY SAFETY INTEGRITY RESPECT COLLABORATION INNOVATION
Organizational culture is the collective result of how people on the team think and behave, their shared values and how they react to internal and external stimuli. Our core values are the bedrock of why our company exists and the foundation of how decisions are made in order to achieve our goals and fulfill our company’s vision.
www.gswconstruction.com
www.gswconstruction.com
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12Made with FlippingBook interactive PDF creator