GSW CONSTRUCTION, INC. MECHANICAL PROCESS PIPING
A HEAVY CIVIL CONTRACTOR PROVIDING SERVICES IN THE GREATER BAY AREA
www.gswconstruction.com
GSW CONSTRUCTION, INC. Safety is our #1 priority!
Weekly Safety Tailgates LOTO Awareness/Machine Guarding Respiratory Fit-test CPR Training Ladder Safety/Fall Prevention Driver Safety Substance Abuse Awareness for Managers Heat Illness Prevention Program Fire Prevention Training Supervisory Training on Fire Prevention & Excavation
HAZCOM/GHS & Chemical Control Workplace Violence Prevention Plan
Wildfire Smoke Protection Confined Space Training Trenching & Excavation Safety IIPP Employee Responsibilities & Incident Reporting Personal Protective Gear Confined Space Rescue Training
www.gswconstruction.com
GSW CONSTRUCTION, INC.
GSW CONSTRUCTION, INC. IS A LICENSED HEAVY CIVIL CONTRACTOR LOCATED IN SAN FRANCISCO, CALIFORNIA
Founded in March of 2021, GSW serves public utility agencies, private utility agencies, as well as general contractors throughout the greater San Francisco Bay Area. GSW was founded by experienced heavy civil construction professionals, with a collective experience of over 40 years. GSW specializes in small to large construction projects in the public and private sector. GSW’s construction expertise ranges from mass excavations, structural concrete, wet and dry utilities, large diameter welded steel pipe, water and wastewater facilities, aviation fuel line installation and distribution.
101 The Embarcadero Suite #123, San Francisco, CA | www.gswconstruction.com
22-016
BOLLMAN WATER TREATMENT PLANT CONTRA COSTA WATER DISTRICT
www.gswconstruction.com
Process Piping
BOLLMAN WATER TREATMENT PLANT CHEMICAL STORAGE IMPROVEMENTS, PHASE 2 AND SEISMIC STRENGTHENING
STRUCTURAL CONCRETE
STRUCTURAL CONCRETE
MECHANICAL PROCESS PIPING
Temporarily removing sludge collector equipment; demolishing embedded pipe supports Temporarily removing existing chemical tanks Demolishing concrete supports for existing tanks; removing pipe supports, chemical piping,
valves, fittings, control panels, and instrumentation Remove abandoned pipes and electrical conduits
Dispose of removed materials, equipment, and residual chemicals Constructing concrete beams and columns for launder column bracing
Furnishing and installing safety railings Repairing and patching concrete walls Installing seals around existing pipe and conduit penetrations Reinstalling existing sludge collector equipment Constructing new chemical tank pedestals and anchors Reinstalling existing chemical tanks Furnishing and installing chemical piping, fittings, valves, pipe supports, control panels, and instrumentation Furnishing and applying coating on existing fiberglass control panel enclosures Installing trench drains and storm drain pipes Repurposing existing conduits and conductors Furnishing and installing new lining and applying exterior coating on existing chemical storage tank Furnishing and applying chemical resistant coating on existing concrete Testing, startup, and re-commissioning of existing equipment that are re-installed as part of the work; and providing training to District staff for new equipment.
www.gswconstruction.com
22-017
HEAVY INDUSTRIAL MECHANICAL PIPING
www.gswconstruction.com
B31.3 Process Piping Valve Replacement Mechanical Equipment Install Tank Farm Modifications and Repairs
www.gswconstruction.com
22-017
PALO ALTO TWO TURNOUTS
CITY OF PALO ALTO
www.gswconstruction.com
CITY OF PALO ALTO
Construct a temporary bypass pipeline in the WSTD vault to connect to the Palo Alto water main. The bypass piping will include a meter set consisting of a strainer, flow meter, swing check valve, and pressure reducing valve in the WSTD vault. Also replace the current 16” steel pipe connection between the vaults with ductile iron pipe according to the terms and plans detailed in CPAU’s plans. Replace a 16” water pipeline and install a 4” bypass at Service Connection #77, within a portion of SFPUC’s Pipeline Right of Way, located at California Avenue, in the City of Palo Alto, CA.
www.gswconstruction.com
23-025
STORM DRAIN SLIDE GATE REHABILITATION PROJECT CITY OF SANTA CLARA PUBLIC WORKS DEPARTMENT
Install a total of three new slide gates for the City of Santa Clara Department of Public Works (SCDPW). Four temporary sewage bypasses to maintain service during inspections removal and Installation of the new slide gates. Eastside Pump Station: Replacement of two existing slide gates and frames. Rambo Pump Station: Replacement of one existing slide gate, frames, and new electric motor actuator. Rambo Pump Station: Installation of new electric motor operator. New electrical and mechanical systems will go through testing, start-up, and commissioning. Instrumental Control systems, devices, and instruments,
www.gswconstruction.com
www.gswconstruction.com
23-029
DALY CITY PUMP STATION SHUTDOWN
CITY OF DALY CITY
www.gswconstruction.com
Effluent Line Repair
Replace all piping Engineer/Design Pipe Remove and Replace flow meter
www.gswconstruction.com
23-006
NEW BEDFORD SEWER LIFT STATION
VALLEJO FLOOD & WASTEWATER DISTRICT
www.gswconstruction.com
Wet Well & Underground Piping
The work consisted of a new sanitary sewer lift station in the same location as the existing lift station in Vallejo, CA. The new lift station consists of a new wet well with submersible pumps, an electrical and controls building with standby generator, and surge tank for hydraulic transient control.
Install Wet Well & Underground Piping 10’ Diameter Wet Well Sewer Drain Piping Site Drain Electrical Conduits Temporary Sewer Bypass System
www.gswconstruction.com
22-020
ORO LOMA H2S SPONGE PROJECT ORO LOMA SANITARY DISTRICT, ALAMEDA COUNTY
www.gswconstruction.com
DIGESTER GAS ISOLATION AND PURGING
Relocation and installation of an owner-furnished vacuum tank to be used as an iron sponge for H2S removal. Provide and install all associated valving, piping and supports to connect the tank into the existing digester gas feed and new condensate drainage inlet. Installation of tank filter system including owner- furnished cobbles, mesh and iron media.
Provided all piping, including fittings, valves, supports, and accessories. Interconnect all equipment with piping for complete and operable systems, including equipment drains.
www.gswconstruction.com
22-015.3
HARRY TRACY WATER TREATMENT PLANT AMMONIA UPGRADES
HETCH HETCHY REGIONAL WATER SYSTEM SAN FRANCISCO PUBLIC UTILITIES COMMISSION
www.gswconstruction.com
Replacing and installing additional aqua ammonia piping support frames for the piping systems to withstand code-level seismic forces, as shown in the design drawings. Other work includes installing a redundant 1" aqua ammonia line inside the TWR Chemical Injection/Mixing Vault and modernization of the existing Ozone Generator Power Supply Units.
Aqua Ammonia piping supports Replace or modify existing aqua ammonia piping supports Transfer pump base work Phased work to isolate ammonia lines and minimize work hazards Ozone Generator upgrades Pass through Installation of PSU, PLC, HMI will be by SFPUC/EMTs Aqua Ammonia piping work inside the manifold room Replace existing PVC piping with stainless steel New redundant line within manifold room
www.gswconstruction.com
22-028
BAY AREA RAPID TRANSIT (BART) ROSENDIN ELECTRIC
www.gswconstruction.com
Eye Wash Station Replacement
Furnish and install water supply piping to eyewash stations at x y z stations.
www.gswconstruction.com
23-010
SFO JET FUEL HYDRANT SYSTEM TRANSFER LINE REPAIRS
BURNS & MCDONNELL
www.gswconstruction.com
Transfer Line and Hydrant System Repairs
Install rumble plates, linear controls, stabilized construction entrance with tire wash stormwater related Best Management Practices (BMPs) (e.g. straw wattle, silt fencing) as needed at the various work locations. Daily closeout of the Work, including any potential transport or hauling of soil, will require sweeping and cleaning to an acceptable level by the SFO Airfield Operations staff. This project consists of extension (to grade) of one low point drain (NLP-6) and a high point vent (OHP- 6), decommissioning one fuel vault (FV-14), and installation of a high point vent riser into an existing isolation valve pit (BAB-IVP-50-3). This includes installation of pit components, associated equipment, hydrostatic pit testing, and application of protective coatings. Confirmation soil samples are to be analyzed for TPHd using Environmental Protection Agency (EPA) Method 8015M with silica gel cleanup method 3630C.
www.gswconstruction.com
22-015.1.2
CALAVERAS SPILLWAY RETRACTABLE LADDER REPLACEMENT
SAN FRANCISCO PUBLIC UTILITIES COMMISSION
SCOPE OF WORK: Design and fabricate new ladder system.
www.gswconstruction.com
CORE VALUES FAMILY SAFETY INTEGRITY RESPECT COLLABORATION INNOVATION
Organizational culture is the collective result of how people on the team think and behave, their shared values and how they react to internal and external stimuli. Our core values are the bedrock of why our company exists and the foundation of how decisions are made in order to achieve our goals and fulfill our company’s vision.