Production Clear Medium solids production urethane clear. Excellent performer in air and force dry applications of spot repair, panel repair, and overall refinishing. Easy to apply, outstanding flow and leveling, excellent gloss and DOI (Distinction Of Image) excellent durability. Color: Water White Part # Description Size 9000 Production Clear Gallon 9001 Production Clear Quart 9002 Production Clear Catalyst Fast 1/2 Pint 9003 Production Clear Catalyst Medium 1/2 Pint 9004 Production Clear Catalyst Fast Quart 9005 Production Clear Catalyst Medium Quart 9006 Production Clear Catalyst Slow Quart
Substrates Apply over basecoats, catalyzed enamels or urethanes. Follow basecoat manuf. prep recommendations. Mixing 4 part Production Clear 1 part Production Clear Catalyst Set Up Tech Info Tip/Needle: 1.3mm to 1.5mm Spot Air Pressure: 35 - 45 psi / HVLP 5 to 10 psi at cap Overall Air Pressure: 45 - 55 psi / HVLP 5 to 10 psi at cap Viscosity: #2 Zahn 17 - 19 seconds Film Build: 0.8 - 1.0 mils / full wet coat Coverage (@ 1 mil) 465 sq. ft. @ 1 mil Application Apply 2-3 full wet coats @ 40-50 psi allowing 10-15 minutes between coats. Drying Air Dry w/9004 Fast w/9005 Medium w/9006 Slow Dust Free 5-10 minutes 5-10 minutes 10-15 minutes Tack Free 15 minutes 20 minutes 25 minutes Sand Time 16 hours 16 hours 16 hours Recoat 16 hours 16 hours 16 hours Pot Life 4-5 hours 8-10 hours 8-10 hours Force Dry - Purge for 15 minutes, 30 minutes at 140° F. Sand 1 hour 1 hour 1 hour Recoat 1 hour 1 hour 1 hour Buffing If necessary, sand with 1500 or finer grit after 16 hours. Buff with appropriate compound after 24 hours. Buffing is easiest when done within the first 48 hours following application.
Physical Data Volume Solids RTS
29%
Pot Life: VOC RTS:
4 to 10 hours
Less than or equal to 4.4 lb./gallon
Humidity Resistance: Salt Spray Test:
Excellent Excellent
Master Tips If problem occurs during application, painter must get a minimum of 2 coats on vehicle before stopping for repair or additional recoat. Allow to dry overnight, then scuff before primer, color or clear application. Retard in extreme heat or humidity. Accelerate in shop temps below 70°F. If buffing is necessary, buffing operation will be easier within 4 days of application.
Page 30
Made with FlippingBook flipbook maker