Urethane Clear The most versatile clear you’ll ever use. Designed for spot repair, panel repair, and overall refinishing. A unique resin and catalyst system work together to offer you easy application, outstanding flow and leveling, superior gloss and DOI (Distinction Of Image) and extreme durability. Part # Description Size 8900V Urethane Clear Gallon 8904V Urethane Clear Quart 8185V Urethane Clear Catalyst Spot & Panel Quart 8183V Urethane Clear Catalyst Spot & Panel Half Pint 8186V Urethane Clear Catalyst Multi Panel & Overall Quart 8184V Urethane Clear Catalyst Multi Panel & Overall Half Pint Substrates
Apply over basecoats, catalyzed enamels or urethanes. Follow basecoat prep recommendations.
Mixing 4 part Urethane Clear 1 part Urethane Catalyst Set Up Tech Info Tip/Needle: Spot Air Pressure: Overall Air Pressure: Viscosity: #2 Zahn
1.3mm to 1.5mm
35 - 45 psi / HVLP 5 to 10 psi at cap 45 - 55 psi / HVLP 5 to 10 psi at cap
18 - 20 seconds
Film Build:
2.0 - 3.0 mils / full wet coat
Coverage (@ 1 mil)
625 sq. ft. @ 1 mil
Application Apply 1 medium coat followed by 1 full wet coat for incredible gloss. 10-15 minutes between coats. Drying Air Dry w/8185V Spot & Panel w/8186V Overall Dust Free 10-20 min 25-30 min Tack Free 25-40 min 45-60 min Sand Time 16 hours 16 hours Recoat Overnight Overnight Pot Life 1.5-2.5 hours 4-6 hours Force Dry - Purge for 15 to 20 minutes, 40 minutes at 140° F. Sand 1 hour 1 hour Recoat 4 hours 4 hours Buffing If necessary, sand with 1500 or finer grit after 16 hours. Buff with appropriate compound after 24 hours. Buffing is easiest when done within the first 48 hours following application.
Physical Data Volume Solids RTS
39%
Pot Life: VOC RTS:
4 to 6 hours
Less than or equal to 4.2 lb./gallon
Humidity Resistance:
Excellent Excellent
Salt Spray Test:
Master Tips If problem occurs during application, painter must get a minimum of 2 coats on vehicle before stopping for repair or additional recoat. Allow to dry overnight, then scuff before primer, color or clear application. Retard in extreme heat or humidity. Accelerate in shop temps below 70°F. If buffing is necessary, buffing operation will be easier within 2 days of application.
Page 32
Made with FlippingBook flipbook maker