PYI Price List

APPLICATION GUIDE

2

APPLY Apply and spread KiwiGrip onto the prepped surface. KiwiGrip can even be applied on top of other non- skid surfaces.

ROLL Use the roller to achieve the texture you desire. For more aggressive non-skid allow coating to dry slightly then lightly roll again.

3

1 PREP

Start out by masking off the area that you will be painting with painters tape. Then simply sand the selected areas flat. Clean with de-greasing soap and mask-off the area before applying KiwiGrip.

KIWIGRIP APPLICATION & DRYING WINDOW Maintain deck and ambient conditions as shown in each zone before allowing KiwiGrip to get wet.

100F / 38C

90F / 32C

ZONE 1 4 Hours Minimum

80F / 27C

70F / 21C

ZONE 2 8 Hours Minimum

60F / 16C

50F / 10C

ZONE 3 12 Hours Minimum

40F / 4C

10% 20% 30% 40% 50%

60% 70% 80% 90% 100%

RELATIVE HUMIDITY

1. Do not apply KiwiGrip if conditions are expected to fall outside application window before KiwiGrip is fully dry. 2. Application in direct sunlight and in hot conditions significantly reduce tack time. (Add up to 10% water to extend tack time). 3. Drying time in cold conditions is significantly extended. (Moving air from a fan or breeze will shorten drying time).

Made with FlippingBook Ebook Creator