B1 vs S4HC

Manufacturing

Challenge

B1

S4

Comment

MRP runs in S4HC fully automated, you just define the MRP parameters and schedule it as an automated run Production confirmation is done in a simple screen, and you can confirm the timings and materials allocated on a specific operation

B1 doesn't have a scheduled MRP run, you have to run MRP manually each time

Manual MRP

Critical

Production confirmation is not available

Production Confirmation

Critical

Planned Vs Actual Costing reports are generated on different levels, order, product, workcenter, etc…

Production Costing

No accurate costing

Critical

The full end to end Quality Management Cycle is available in S4HC and not available at all in B1

Quality Control And Assurance

Not available

Critical

The full end to end maintenance cycle is available in S4HC and not available at all in B1

Preventive And Corrective Maintenance

Not available

Critical