Manufacturing
Challenge
B1
S4
Comment
MRP runs in S4HC fully automated, you just define the MRP parameters and schedule it as an automated run Production confirmation is done in a simple screen, and you can confirm the timings and materials allocated on a specific operation
B1 doesn't have a scheduled MRP run, you have to run MRP manually each time
Manual MRP
Critical
Production confirmation is not available
Production Confirmation
Critical
Planned Vs Actual Costing reports are generated on different levels, order, product, workcenter, etc…
Production Costing
No accurate costing
Critical
The full end to end Quality Management Cycle is available in S4HC and not available at all in B1
Quality Control And Assurance
Not available
Critical
The full end to end maintenance cycle is available in S4HC and not available at all in B1
Preventive And Corrective Maintenance
Not available
Critical