Beam Schedule
Engineering Passed
Claded with 18G Flat Sheet of Metal on both sides(CB)
Glulam Beam(GB)
Beam Depth
Beam Height
Beam Length
Beam Capacity
5 ' -2-1/2" 1 ' -0" 1 ' -0" 1 ' -0"
15 ' -11-1/2" 16 ' -8-1/16" 2 ' -8" 2 ' -11"
5-1/2" 5-1/2" 5-1/2" 5-1/2"
B57 B58 B59 B60
Made with FlippingBook Online newsletter maker